(A) The Director shall consider each application and determine whether the public sewer is of such capacity and construction that the desired connection may be made in accordance with the proper engineering and construction practices and whether the property has been assessed or the owner of the property has contributed to the cost of construction of the sewer.
(B) No charge or fee for the construction of the sewer shall be charged if the Director determines that:
(1) The land is part of an assessment district upon which the cost of construction of the sewer was assessed according to benefits derived from the construction of the sewer as a local or district sewer as distinguished from an outfall sewer;
(2) The owner of the land, or his or her predecessor in interest, constructed the sewer or contributed to the cost of its construction.
(`78 Code, § 13.12.090.) (Ord. 3346 § 4, 2022; Ord. 1682 § 3, 1983.)