(A) Compliance schedule progress reports, if required, shall be submitted every 30 days during the time the compliance schedule is in force, including a final compliance report at the conclusion of the compliance schedule. The industrial user shall state whether or not compliance was achieved for the increment of progress to be met on such a date. If progress cannot be achieved, the industrial user shall state the reasons for the delay and the steps to be taken to return the dates originally established in the compliance schedule.
(B) All significant and categorical industrial users shall submit progress reports on compliance every three months or as required by the discharge permit. These reports shall include effluent sample analyses, with the name and concentration or mass of the pollutants in the industrial user permit; average and maximum daily wastewater flows for all regulated processes, and total flow for the reporting period; average and maximum daily production rates; and total production rate for the reporting period. All SIUs, both categorical and non-categorical, must report all monitoring results for any regulated pollutant to the Director, including results from monitoring conducted more frequently than required, as set forth in 40 CFR 403.12(g)(6).
(C) All required reports: BMR's compliance reports, periodic reports on continued compliance, and sample date submittals must be signed by an authorized representative of the user, as defined and set forth in 40 CFR 403.12(1).
(D) All required reports in this subsection must have an accompanying certification by a qualified professional, stating that pretreatment standards are or are not being met as set forth in 40 CFR 403.6(a)(2)(ii).
(`78 Code, § 13.08.350.) (Ord. 3346 § 3, 2022; Ord. 3111 § 3 (part), 2012; Ord. 2932 § 1, 2008; Ord. 2330 § 1 (part), 1997; Ord. 2195 § 1 (part), 1994.)