All industrial users who discharge 10,000 gallons per day or more of industrial wastewater or as required by the Director shall install a continuous monitoring flow meter capable of measuring the industrial user's discharge to the city's sewerage system. The flow measurement device shall conform to standards issued by the Director.
(`78 Code, § 13.08.090.) (Ord. 3346 § 3, 2022; Ord. 3111 § 3 (part), 2012; Ord. 2932 § 1, 2008; Ord. 2330 § 1 (part), 1997; Ord. 2195 § 1 (part), 1994.)