§ 3126.10 Final Protection Against Erosion
   (a)   All permanent excavations and fill construction shall be performed so as to minimize soil erosion and sedimentation pursuant to the established best management practices and standards regarding seeding and mulching, sodding, plantings, and erosion protection. The excavation and fill permit, and the bond for same, shall not be released until final erosion protection measures have been established.
   (b)   No proposed grading work shall cause detrimental erosion or sedimentation to adjacent properties or the public right-of-way.
(Ord. No. 721-16. Passed 7-13-16, eff. 7-17-16)