The following schedule is applicable to all electric street lighting service provided by the Division of Cleveland Public Power to governmental entities:
(a) Non-ornamental Lighting Service.
Mercury Vapor (Watt)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
Mercury Vapor (Watt)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
175 | 75 | $5.55 |
250 | 105 | $6.46 |
400 | 165 | $8.40 |
1000 | 395 | $14.00 |
High Pressure Sodium (Watt)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
100 | 52 | $6.20 |
150 | 71 | $7.66 |
250 | 112 | $9.94 |
400 | 174 | $11.28 |
(b) Ornamental Lighting Service – Type I (thirty (30) ft. Steel Pole).
Mercury Vapor (Watt)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
Mercury Vapor (Watt)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
100 (E & M only) | 46 | $6.00 |
175 | 75 | $14.10 |
175 (E & M only) | 75 | $4.57 |
250 | 105 | $14.75 |
250 (E & M only) | 105 | $5.15 |
400 | 165 | $16.50 |
400 (E & M only) | 165 | $6.55 |
700 | 280 | $17.50 |
700 (E & M only) | 280 | $8.00 |
1000 | 395 | $22.45 |
1000 (E & M only) | 395 | $9.95 |
High Pressure Sodium (Watt)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
100 | 52 | $10.58 |
100 (E & M only) | 52 | $6.15 |
150 | 71 | $12.04 |
150 (E & M only) | 71 | $7.55 |
250 | 112 | $14.62 |
250 (E & M only) | 112 | $9.25 |
400 | 174 | $18.00 |
400 (E & M only) | 174 | $12.25 |
Fluorescent (Watt*)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
200 | 101 | $10.45 |
* Not available for new installation
(c) Ornamental Lighting Service – Type II (thirty (30) ft. Concrete Pole).
Mercury (Watt)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
400 | 165 | $22.99 |
High Pressure Sodium (Watt)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
250 | 112 | $21.21 |
400 | 174 | $24.59 |
(d) Ornamental Lighting Service – Type III (forty-one (41) ft. Steel Pole w/Breakaway Base).
Mercury Vapor (Watt)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
1000 | 395 | $34.45 |
High Pressure Sodium (Watt)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
400 | 174 | $30.00 |
(e) Street and Highway Lighting Service – Energy Only.
Mercury (Watt)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
Mercury (Watt)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
100 (Controlled) | 40 | $1.15 |
100 (Continuous) | 96 | $2.40 |
175 (Controlled) | 75 | $1.88 |
175 (Continuous) | 158 | $3.95 |
250 (Controlled) | 105 | $2.63 |
Mercury (Watt)
|
KWH/Lamp | Monthly Rate/Lamp
|
250 (Continuous) | 220 | $5.50 |
400 (Controlled) | 165 | $4.13 |
400 (Continuous) | 346 | $8.65 |
700 (Controlled) | 280 | $7.00 |
1000 (Controlled) | 395 | $9.88 |
High Pressure Sodium (Watt)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
100 (Controlled) | 52 | $1.30 |
100 (Continuous) | 110 | $2.75 |
150 (Controlled) | 71 | $1.78 |
150 (Continuous) | 150 | $3.75 |
200 (Controlled) | 88 | $2.20 |
200 (Continuous) | 185 | $4.63 |
High Pressure Sodium (Watt)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
250 (Controlled) | 112 | $2.80 |
250 (Continuous) | 236 | $5.90 |
400 (Controlled) | 174 | $4.35 |
400 (Continuous) | 366 | $9.15 |
1000 (Controlled) | 396 | $9.90 |
Metal Halide (Watt)
|
KWH/Lamp
|
Monthly Rate/Lamp
|
1000 (Controlled) | 391 | $9.78 |
(f) Terms and Conditions.
(1) Street lights will be operated by time clock or by photoelectric control, to provide illumination from dusk to dawn, unless illumination is specified as continuous.
(2) The Division of Cleveland Public Power pays for the entire installation and amortizes the costs through the monthly rate.
If the installation is paid for by an outside party (Federal, State, County or private) and the Division maintains the installation, the Division shall charge the appropriate “energy and maintenance only” (E & M only) rate.
If the installation is paid for and maintained by an outside party (Federal, State, County or private), the Division shall charge the appropriate “energy only” rate.
(3) The Division may, at its discretion, meter “energy only” installations. If such an installation is metered, the energy shall be billed at two and one- half cents ($0.025) per kilowatt hour.
(4) “Non-ornamental lighting service” means lights of an overhead-type construction where the supply circuits are overhead wires and the lights are attached or suspended from wooden poles, trolley poles or are wall-mounted.
(5) “Ornamental lighting service” means all lights other than non-ornamental including lights of an underground-type construction where the supply circuits are underground cables and lights are attached to ornamental standards; lights of an overhead construction where the supply circuits are overhead and the lights are attached to ornamental steel or concrete poles; and the lights that are wall-mounted in which the supply circuit is enclosed in conduit.
(g) Environmental and Ecological Adjustment. An adjustment to the Energy Adjustment Charge shall be applied to this rate as set forth and described in Section 523.17.
(h) Energy Adjustment Charge. In accordance with Section 523.21, an incremental charge or credit for excess energy costs shall be determined and applied on a monthly basis by the Division. Such incremental charge may be made in addition to the rates established in this section, but in no case shall such charge exceed the amount calculated using the formula established in Section 523.21.
(Ord. No. 472-2022. Passed 5-23-22, eff. 5-25-22)