18-28-305.4 Interval of support.
   Piping shall be either supported at distances not exceeding the spacing specified in Table 18-28-305.4, Piping Support Spacing.
Table 18-28-305.4
Piping Support Spacing a
Piping Material
Maximum Horizontal Spacing
(feet)
Maximum Vertical Spacing
(feet)
Piping Material
Maximum Horizontal Spacing
(feet)
Maximum Vertical Spacing
(feet)
ABS pipe
4
10 c
Aluminum pipe and tubing
10
15
Brass pipe
10
10
Brass tubing, 1 1/4-inch diameter and smaller
6
10
Brass Tubing, 1 1/2-inch diameter and larger
10
10
Cast-iron pipe b
5
15
Copper or copper-alloy pipe
12
10
Copper or copper-alloy tubing,
1 1/4-inch diameter and smaller
6
10
Copper or copper-alloy tubing,
1 1/2-inch diameter and larger
10
10
CPVC pipe or tubing, 1 inch and smaller
3
10 c
CPVC pipe or tubing, 1 1/4-inch and larger
4
10 c
Steel Pipe
12
15
Steel Tubing
8
10
Lead pipe
Continuous
4
PB pipe or tubing
2 2/3 (32 in.)
4
PEX Tubing
2 2/3 (32 in.)
10 c
PVC pipe
4
10 c
 
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm.
a   See Section 18-28-301.18.
b   The maximum horizontal spacing of cast-iron pipe hangers shall be increased to 10 feet where 10-foot lengths of pipe are installed.
c   Mid-story guide.
(Amend Coun. J. 9-14-21, p. 35949, Art. III, § 4)