Skip to code content (skip section selection)
Compare to:
Chicago Overview
Municipal Code of Chicago
MUNICIPAL CODE OF CHICAGO
TITLE 1 GENERAL PROVISIONS
TITLE 2 CITY GOVERNMENT AND ADMINISTRATION
TITLE 3 REVENUE AND FINANCE
TITLE 4 BUSINESSES, OCCUPATIONS AND CONSUMER PROTECTION
TITLE 5 HOUSING AND ECONOMIC DEVELOPMENT
TITLE 6 HUMAN RIGHTS*
TITLE 7 HEALTH AND SAFETY
TITLE 8 OFFENSES AFFECTING PUBLIC PEACE, MORALS AND WELFARE
TITLE 9 VEHICLES, TRAFFIC AND RAIL TRANSPORTATION
TITLE 10 STREETS, PUBLIC WAYS, PARKS, AIRPORTS AND HARBORS
TITLE 11 UTILITIES AND ENVIRONMENTAL PROTECTION
CHAPTER 11-4 ENVIRONMENTAL PROTECTION AND CONTROL
ARTICLE I. GENERAL PROVISIONS (11-4-010 et seq.)
ARTICLE II. AIR POLLUTION CONTROL (11-4-580 et seq.)
ARTICLE III. RESERVED (11-4-860 et seq.)
ARTICLE IV. CONTROL OF EMISSIONS OF ORGANIC SUBSTANCES (11-4-990 et seq.)
ARTICLE V. RESERVED (11-4-1000 et seq.)
ARTICLE VI. WASTE CONTROL (11-4-1020 et seq.)
ARTICLE VII. HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS REQUIREMENTS* (11-4-1100 et seq.)
ARTICLE VIII. POLLUTION OF WATERS* (11-4-1410 et seq.)
ARTICLE IX. SOLID AND LIQUID WASTE CONTROL (11-4-1490 et seq.)
ARTICLE X. PHOSPHORUS CONTROL (11-4-1610 et seq.)
ARTICLE XI. WASTE FACILITY - HEARING (11-4-1640 et seq.)
ARTICLE XII. ELECTRIC UTILITY FRANCHISE CONTROL AND ENFORCEMENT (11-4-1680 et seq.)
ARTICLE XIII. RECYCLING (11-4-1820 et seq.)
ARTICLE XIV. REPROCESSABLE CONSTRUCTION/DEMOLITION MATERIAL (11-4-1905 et seq.)
ARTICLE XV. WASTE PREVENTION (11-4-2070 et seq.)
ARTICLE XVI. FLAMMABLE LIQUID TANK REGULATIONS (11-4-2090 et seq.)
ARTICLE XVII. FUEL AND LUBRICATION FACILITIES (11-4-2140 et seq.)
ARTICLE XVIII. ASBESTOS, SANDBLASTING, AND GRINDING STANDARDS (11-4-2150 et seq.)
ARTICLE XIX. RESERVED (11-4-2230 et seq.)
ARTICLE XX. RECYCLING FACILITY AND URBAN FARM ACCESSORY COMPOSTING PERMITS* (11-4-2510 et seq.)
ARTICLE XXI. RESERVED (11-4-2700 et seq.)
ARTICLE XXII. INVASIVE SPECIES CONTROL (11-4-3000 et seq.)
ARTICLE XXIII. RESERVED (11-4-4000 et seq.)
CHAPTER 11-5 REDUCTION AND RECYCLING PROGRAM*
CHAPTER 11-6 GREEN BUSINESS PROGRAM
CHAPTER 11-8 WATER SUPPLY AND DISTRIBUTION SYSTEMS*
CHAPTER 11-12 WATER SUPPLY AND SERVICE
CHAPTER 11-16 PUBLIC SEWERS AND DRAINS*
CHAPTER 11-18 STORMWATER MANAGEMENT
CHAPTER 11-20 GAS SUPPLY AND SERVICE
CHAPTER 11-30 RESERVED*
TITLE 12 RESERVED
TITLE 13 BUILDINGS AND CONSTRUCTION
TITLE 14 RESERVED*
TITLE 14A ADMINISTRATIVE PROVISIONS OF THE CHICAGO CONSTRUCTION CODES*
TITLE 14B BUILDING CODE*
TITLE 14C CONVEYANCE DEVICE CODE*
TITLE 14E ELECTRICAL CODE*
TITLE 14F FIRE PREVENTION CODE*
TITLE 14G FUEL GAS CODE*
TITLE 14M MECHANICAL CODE*
TITLE 14N 2022 ENERGY TRANSFORMATION CODE*
TITLE 14P PLUMBING CODE*
TITLE 14R BUILDING REHABILITATION CODE*
TITLE 14X MINIMUM REQUIREMENTS FOR EXISTING BUILDINGS*
TITLE 15 FIRE PREVENTION
TITLE 16 LAND USE
TITLE 17 CHICAGO ZONING ORDINANCE
TITLE 18 BUILDING INFRASTRUCTURE
APPENDIX TO THE MUNICIPAL CODE OF CHICAGO (RESERVED)*
TABLES
Chicago Zoning Ordinance and Land Use Ordinance
Loading...
11-4-2550 Permit – Fees.
   (a)   The term of a recycling facility permit shall be for no more than three years. The three-year permit fee shall be:
      Class I.....$300.00
      Class II
         Less than 500 tons per day.....$1,500.00
         500 to 1,000 tons per day.....$2,250.00
         More than 1,000 tons per day.....$3,000.00
      Class III.....$3,000.00
         Class III recycling facility permit for a not-for-profit applicant that conducts a composting operation of less than 4,000 tons per year.....$300.00
       Class IV.....$3,000.00
      Class V.....$4,500.00
Permits for less than a three-year period shall be assessed a prorated fee.
   (b)   The term of an urban farm accessory composting operation permit shall be for no more than three years. The three-year permit fee shall be $300.00. Permits for less than a three-year period shall be assessed a prorated fee.
(Coun. J. 12-9-92, p. 25465; Amend Coun. J. 10-7-98, p. 78812; Amend Coun. J. 12-4-02, p. 99931, § 8.5; Amend Coun. J. 4-9-08, p. 24657, § 6; Amend Coun. J. 2-9-11, p. 112149, § 18; Amend Coun. J. 7-29-15, p. 4110, § 3; Amend Coun. J. 11-7-22, p. 54948, Art. III, § 7)
11-4-2560 Permit – Term – Nontransferability.
   No permit issued under this article shall be transferable or assignable.
(Coun. J. 12-9-92, p. 25465; Amend Coun. J. 10-7-98, p. 78812)
11-4-2565 Class V recycling facilities – Permitting, operational and recordkeeping requirements.
   (a)   Application. In addition to the information required under Section 11-4-2530, the application for a permit for a Class V facility shall include the following information:
      (1)   the name, address and telephone number of both the facility owner and operator;
      (2)   a description of the tagging and recordkeeping procedures the facility will employ to (i) demonstrate compliance with the requirements of subsection (b) of this section; and (ii) identify the source and transporter of any material accepted by the facility; and
      (3)   any other information that the commissioner may require.
   (b)   Duties. An owner or operator of a Class V facility shall have the following duties:
      (1)   to limit the percentage of incoming non-recyclable construction and demolition debris to 25% or less of the total incoming construction and demolition debris, as calculated per load by volume, so that 75% or more of the construction and demolition debris accepted per load by volume consists of recyclable construction and demolition debris;
      (2)   within 48 hours of receipt of construction and demolition debris at the facility, to sort such debris in order to separate the recyclable construction and demolition debris from the non-recyclable construction and demolition debris to be disposed of or discarded;
      (3)   within 24 hours of the separation of debris required under item (2) of this subsection (b), to transport off site for disposal, in accordance with all applicable federal, state and local requirements, all non- recyclable construction and demolition debris;
      (4)   within 45 days of its receipt at the facility, to transport all putrescible recyclable construction and demolition debris or combustible recyclable construction and demolition debris to a properly permitted recycling or disposal facility;
      (5)   within 3 months of its receipt at the facility, to transport all non-putrescible recyclable construction and demolition debris for recycling or disposal;
      (6)   to employ tagging and recordkeeping procedures to (i) demonstrate compliance with the requirements of this subsection (b); and (ii) identify the source and transporter of material accepted by the facility;
      (7)   to control odor, noise, combustion of materials, disease vectors, dust and litter;
      (8)   to control, manage and dispose of any storm water runoff and leachate generated at the facility in accordance with applicable federal, state and local requirements; and
      (9)   to control access to the facility.
   (c)   Recordkeeping – Required. An owner or operator of a Class V facility shall keep and maintain on file for a period of three years written records containing the following information:
      (1)   the total tonnage or cubic yards of all non-recyclable construction and demolition debris accepted at the facility per load, as calculated on a daily basis;
      (2)   the name and location of each disposal site used for the disposal of any non-recyclable construction and demolition debris accepted at the facility;
      (3)   the percentage of non-recyclable material transported to each disposal site required to be identified under paragraph (2) of this subsection (c);
      (4)   the total tonnage or cubic yards of all recyclable material accepted at the facility per load, as calculated on a daily basis;
      (5)   the name and location of the individual, facility or business to which such recyclable material is transported;
      (6)   the percentage of recyclable material transported to each individual, facility or business required to be identified under paragraph (5) of this subsection (c); and
      (7)   any other information that the commissioner may require.
   (d)   Permit revocation. In addition to any other penalty provided by law, the commissioner may revoke the permit of the owner and/or operator of a Class V facility (1) for any violation of this section or article; or (2) if such owner/and or operator is found to be engaging in open dumping or fly dumping or otherwise disposing of construction/demolition material or debris in violation of this chapter or any other provision of the Municipal Code of Chicago.
(Added Coun. J. 2-9-11, p. 112149, § 19)
11-4-2570 Recyclable materials – Designated.
   Facilities permitted under this article shall collect, process and store only recyclable materials as defined in Section 11-4-2510. Unauthorized materials, including but not limited to municipal solid waste and stolen goods including recyclables intended for collection by the department of streets and sanitation but not delivered by the department or its agent shall not be accepted at the facility.
(Coun. J. 12-9-92, p. 25465; Amend Coun. J. 10-7-98, p. 78812)
11-4-2580 Recyclable materials – Segregation and storage.
   Recyclable materials shall be segregated and stored in receptacles or enclosures constructed of approved materials or in another manner approved in the permit as directed by the commissioner. Newsprint, paper, corrugated paper and cardboard shall be stored in closed containers, and storage of such material shall comply with all applicable provisions of the Municipal Code, including all ordinances relating to fire prevention.
(Coun. J. 12-9-92, p. 25465; Amend Coun. J. 10-7-98, p. 78812; Amend Coun. J. 4-9-08, p. 24657, § 6)
11-4-2590 Recyclable materials – Receptacles.
   Unless alternate storage methods have been approved pursuant to Section 11-4-2580, receptacles in Class I, II, III, and IV recycling facilities shall be clearly marked with the type of recyclable material to be deposited. Letters shall not be less than three inches high. No material other than that specified on a receptacle shall be deposited therein.
(Coun. J. 12-9-92, p. 25465; Amend Coun. J. 10-7-98, p. 78812; Amend Coun. J. 4-9-08, p. 24657, § 6)
11-4-2600 Recyclable materials – Storage areas to be kept clean.
   The area surrounding receptacles for the temporary storage of recyclable materials shall at all times be maintained in a clean and sanitary manner. No recyclable materials or waste materials of any kind shall be allowed to accumulate around any receptacle or to overflow from any receptacle.
(Coun. J. 12-9-92, p. 25465; Amend Coun. J. 10-7-98, p. 78812)
11-4-2610 Building and fire regulations – Applicable.
   Storage of recyclable material within a completely enclosed building shall be permitted subject to the building and fire regulations of the Municipal Code.
(Coun. J. 12-9-92, p. 25465; Amend Coun. J. 10-7-98, p. 78812)
11-4-2620 Storage time limit – Maintenance of records.
   No recyclable materials shall be stored at any recycling facility for longer than 90 days except for processed, recyclable materials as approved in the permit. Each permittee under this article shall maintain records which indicate the date, quantity and type of recyclable materials received. Disposition records shall also be kept which indicate the type, quantity and date of disposition of recyclable materials. Such records shall be open to inspection by the commissioner or his authorized agent during normal business hours and at other times upon reasonable notice.
(Coun. J. 12-9-92, p. 25465; Amend Coun. J. 10-7-98, p. 78812; Amend Coun. J. 11-16-11, p. 13798, Art. II, § 6)
Loading...