As used in this article , unless the context clearly indicates otherwise:
"Closure" shall mean those actions taken by the owner and/or operator to cease operations and to ensure that a facility is closed in conformance with this chapter and all applicable federal, state and local laws in effect at the time of such closure.
"Construction or demolition debris" has the meaning ascribed to the term in Section 11-4-120.
"Contractor" has the meaning ascribed to the term in Section 11-4-1905(1)(a).
"Governmental entity" means any unit of federal, state or local government.
"Incidental construction/demolition debris" or "incidental debris" shall mean uncontaminated dirt, metal, mortar, gypsum, plasterboard, wood, and sand which are derived from a construction or demolition-site and intermingled with reprocessable material.
"Open dumping" or "fly dumping" shall mean the disposal of garbage, material, refuse and other waste from one or more sources at a disposal site that is not permitted to receive such waste.
"Owner or operator" has the meaning ascribed to the term in Section 11-4-120.
"Reprocessable construction/demolition material" shall mean broken concrete, bricks, rock, stone or paving asphalt generated from construction or demolition activities.
"Reprocessable construction/demolition material facility" or "facility" shall mean a site used for purposes of receiving, storing, reprocessing and transport of reprocessable construction/demolition material.
"Reprocessed" or "reprocessing" or "reprocessing activity" means crushed or broken into smaller constituent parts by a reprocessing device.
"Reprocessing device" shall mean a device designed to crush or break reprocessable material into smaller constituent parts for the purpose of reprocessing such material and for which a permit has been issued by the department of health pursuant to this Code.
Other definitions relating to this article will be found in Article I of Chapter 11-4.
(Added Coun. J. 6-23-93, p. 34796; Amend Coun. J. 3-6-96, p. 17622; Amend Coun. J. 2-9-11, p. 112149, § 8; Amend Coun. J. 11-16-11, p. 13798, Art. II, § 6)
The purpose and intent of this article is to regulate the receipt, storage, reprocessing and transport of reprocessable construction and demolition material and to prevent the improper disposal of construction and demolition debris within the City of Chicago. This article shall be entitled the "reprocessable construction/demolition material ordinance".
(Added Coun. J. 6-23-93, p. 34796)
(A) Permit Required. Except as otherwise provided in Section 11-4-1935, no reprocessable construction/demolition material shall be sent to, received by, stored at or reprocessed at any location except at a facility properly zoned and for which a permit for a reprocessable construction/demolition material facility has been issued pursuant to this chapter. This section shall not be interpreted as a ban on the disposal of reprocessable construction/demolition material in a properly zoned and permitted sanitary landfill or the receipt and transfer of such material at a properly zoned and permitted waste transfer facility.
(B) Permit Application. Application for a permit for a reprocessable construction/demolition material facility shall be made to the commissioner and shall provide the following information:
(1) Name, address, and telephone number of the applicant;
(2) The telephone number(s) of the owner or operator of the site of the proposed facility;
(3) The address of the facility sought to be licensed;
(4) Payment of the fee as set forth in Section 11-4-1960;
(5) Design of the proposed facility, including buildings, equipment, fencing, ingress and egress, pollution control measures, and routes to and from the facility;
(6) Plan of operation for proposed facility including type and number of reprocessing devices for reprocessing reprocessable material or alternative plan for timely reprocessing of the material;
(7) An "air pollution control permit" for reprocessing devices used for preprocessing reprocessable material issued by the department of health pursuant to this Code;
(8) Copy of certified letter to the alderman within whose ward the facility is proposed to be located, setting forth the intention and nature of use as a reprocessable construction/demolition material facility. An application shall not be considered complete without such copy of the certified letter and in no event shall a permit be issued until 30 days after the date of the certified letter or receipt by commissioner of notice from the alderman that such 30-day period is waived;
(9) Evidence that the facility is located in a district for which a variation in the nature of a special use may be obtained from the zoning board of appeals pursuant to the Chicago Zoning Ordinance, Title 17;
(10) Any further information deemed necessary by the commissioner.
The commissioner shall have 90 days to act upon the application.
(C) No permit for a reprocessable construction/demolition material facility shall be granted by the commissioner unless:
(1) The application for such permit is fully and accurately completed and all zoning and other requirements in subsection (B) hereof are met;
(2) The existence of a facility will not have an adverse effect on traffic flow or parking within the surrounding area;
(3) In the determination of the commissioner, the facility will not have an adverse impact on the public health and safety;
(4) The commissioner determines that the facility has adequate pollution control measures;
(5) The commissioner determines that sufficient on-site space will be available for incidental debris and reprocessable construction/demolition material.
(D) Permit Revocation. The commissioner may revoke the permit of the owner and/or operator of a reprocessable construction/demolition material facility found to be engaging in open dumping or fly dumping or otherwise disposing of construction/demolition material or debris in violation of this chapter or any other provision of the Municipal Code of Chicago.
(Added Coun. J. 6-23-93, p. 34796; Amend Coun. J. 8-3-94, p. 55153; Amend Coun. J. 2-9-11, p. 112149, § 9; Amend Coun. J. 11-16-11, p. 13798, Art. II, § 6)
(a) (1) Written authorization required. No person shall engage in the reprocessing of reprocessable construction/demolition materials or the temporary storage of reprocessed materials in the City without having first obtained a written construction site reprocessing authorization from the Commissioner. Application for a construction site reprocessing authorization shall be made on forms provided by the Commissioner for such purpose. Applicants shall provide the following information:
(i) the applicant's contact information;
(ii) written consent from the owner, or the owner's authorized agent, of the property on which the reprocessing or temporary storage will occur;
(iii) a description and estimated quantity of the material proposed to be reprocessed or temporarily stored;
(iv) a description of the planned end-use for the reprocessed material; and
(v) any other information reasonably deemed necessary by the Commissioner to ensure the construction site reprocessing operation can operate as proposed, is protective of public health and the environment, and will not cause a public nuisance.
(2) Conditions for issuance of authorization. Except as otherwise provided in subsection (a)(3) and subsection (a)(4) of this section, the Commissioner shall not issue a construction site reprocessing authorization unless all of the following requirements are met:
(i) the construction/demolition material to be reprocessed does not contain lead, asbestos or any other hazardous material; and
(ii) all reprocessing of such construction/ demolition material occurs on the site at which the demolition occurred; and
(iii) the reprocessed construction/ demolition material is used solely on the site at which the demolition occurred for construction activities occurring on such site or as demolition fill material as defined in Section 11-4-2150; and
(iv) the contractor is in compliance with the setback requirements for equipment and materials set forth in subsection (a)(5) of this section.
(3) Governmental entities – Requirements. A governmental entity, as defined in Section 11-4-1910, shall not be subject to the requirement set forth in paragraph (vi) of subsection (a)(1) of this section, and such governmental entity may transfer for reuse off the site at which the demolition occurred any reprocessable construction/demolition material generated from such demolition if all of the following requirements are met:
(i) the governmental entity complies with the requirements set forth in paragraphs (i), (iii), (iv), (v) and (vii) of subsection (a)(1); and
(ii) the site on which the demolition occurred and the off-site location where such materials will be transferred for reuse are both public improvement projects undertaken by the same or different governmental entity; and
(iii) prior to transferring the reprocessed construction/demolition material from the demolition site to the off-site location where such material will be reused, the government entity registers the demolition project on the Chicago Soil and Rubble Exchange website or complies with any other alternative registration process approved by the department in duly promulgated rules or regulations; and
(iv) the governmental entity maintains on the Chicago Soil and Rubble Exchange website or any other alternative registration process approved by the department in duly promulgated rules or regulations current and accurate records identifying the date and location of all anticipated and actual transfers of such reprocessed construction/demolition material.
(4) Good faith reprocessor – Requirements. A person shall not be subject to paragraphs (v) and (vi) of subsection (a)(1) of this section, and may reprocess construction/demolition material on a site at which the demolition did not occur, if all of the following requirements are met:
(i) the person complies with paragraphs (i), (ii), (iii), (iv) and (vii) of subsection (a)(1); and
(ii) the construction/demolition material being reprocessed was illegally dumped at the site; and
(iii) the person has not knowingly contributed to that illegal dumping; and
(iv) the construction/demolition material is reprocessed on the site of the illegal dumping; and
(v) the reprocessed construction/ demolition material is used for construction activities on the site.
(5) Setback requirements. No reprocessing device or stockpile of reprocessable construction/ demolition material or of reprocessed construction/ demolition material shall be located in the following places:
(i) within 200 feet of any school, childcare facility, hospital, residential building or mixed occupancy building with a residential use;
(ii) within 100 feet of any building other than a school, childcare facility, hospital, residential building or mixed occupancy building with a residential use;
(iii) within 100 feet of any public way or park.
Provided, however, that if (A) compliance with the requirements of this subsection (a)(4) is physically impossible or hazardous due to the configuration, location or unique characteristics of the site where reprocessing or temporary storage of construction/demolition material is authorized under this section; and (B) the contractor can show either that (1) the issuance of a certificate of exemption under this subsection will not create a public nuisance or adversely impact the surrounding area or surrounding users, or (2) such public nuisance or adverse impact can be eliminated or substantially reduced through the adoption of an abatement or mitigation plan, the contractor may apply to the commissioner for a written certificate of exemption from compliance with the requirements of this subsection (a)(4). Prior to granting any exemption under this subsection (a)(4), the Commissioner or the Commissioner's designee may conduct a site visit of the subject premises to determine the validity of the claim of impossibility or hazard and to determine whether the issuance of a certificate of exemption under this subsection will create a public nuisance or adversely impact the surrounding area or surrounding users. Upon a showing of physical impossibility or hazard and a finding that the issuance of a certificate of exemption either will not create a public nuisance or adversely impact the surrounding area or surrounding users or that such public nuisance or adverse impact can be eliminated or substantially reduced through the adoption of an abatement or mitigation plan, as determined by the Commissioner, the Commissioner shall issue to the contractor a certificate of exemption for such premises. Such certificate of exemption shall specify the scope and conditions of any exemption so granted, and may include provisions for nuisance abatement or other reasonable measures to eliminate or substantially reduce any adverse impact on the surrounding area or surrounding users. Such certificate shall be valid for the period of time identified on the face of such certificate or until such time that the certificate is revoked for cause. Prior to revoking a certificate for cause, the Commissioner shall give the certificate holder notice that the certificate will be revoked in three days and provide the certificate holder an opportunity to respond before the revocation takes effect. The Commissioner may require a work stoppage during the pendency of the revocation. A copy of such certificate shall be posted by the contractor in a conspicuous place on the premises covered by such certificate and, upon request by any authorized City official, shall be made available by the contractor for inspection by such City official.
(6) Operating requirements. Prior to reprocessing such construction/demolition material, the contractor shall:
(i) verify that each load of such material to be reprocessed does not contain lead, asbestos, or any other hazardous material of the type that renders recycling of such material illegal or impossible;
(ii) create and maintain a written record documenting the results of such verification; and
(iii) provide a copy of the written record required under this subsection (a)(6) to the owner or operator of the property on which the reprocessing occurs. The written record required under this subsection (a)(6) shall be kept on file by the owner or operator and contractor for a period of three years and, upon request by any authorized City official, shall be made available without undue delay for inspection by such authorized City official.
(7) Duration of authorization. The written authorization issued under subsection (a)(1) of this section shall be valid for a period of three months, as measured from the date on which such authorization is issued. Provided, however, that upon application to the Commissioner, such authorization may be extended for an additional period(s) of time, each of which additional period shall not exceed three months, so long as construction/demolition material requiring reprocessing and reprocessing equipment remain on the site. Any reprocessable or reprocessed construction/demolition material that is not used on or removed from the site within three months of the date on which the temporary authorization is issued or extended under this section shall be subject to the construction site cleanliness rules and regulations for the maintenance of construction site stockpiles and prevention of the off-site dispersion of dust and debris from construction sites promulgated by the department under Section 11-4-765.
(8) Enforcement. It shall be unlawful for any person to violate any of the requirements set forth in this subsection (a). In addition to any other penalty provided by law, any person who violates any of the requirements of this subsection (a) shall be subject to the penalty set forth in subsection (d) of this section. In addition, any authorization issued under this subsection (a) shall be subject to suspension or revocation for cause by the Commissioner following notice in accordance with the applicable provisions of subsection (d) of Section 11-4-025 and an opportunity to demand a hearing in accordance with the procedures set forth in subsection (c) of Section 11-4-025.
(b) Rules. The Commissioner is authorized to adopt rules setting forth application requirements and standards and conditions for the location and operation of construction site reprocessing activities, and to require applicants for and operators of such activities to provide such information as the Commissioner deems necessary to effectuate the purposes of this section. Such rules shall include those standards and conditions necessary to protect the environment, public health and safety and avoid nuisances, and may also include such other requirements as the Commissioner deems necessary and appropriate to carry out this section, including but not limited to financial security requirements and notification requirements.
(c) Fee. The Commissioner shall charge a fee of $750.00 per month for each month or fraction of a month in which construction site reprocessing activity is authorized for the costs of reviewing and inspecting the activity to assure compliance with this section and the rules promulgated hereunder.
(d) Penalty for violation. Penalties imposed for violations of this section shall be as provided in Section 11-4-030 of this Code.
(Added Coun. J. 12-4-02, p. 99931, § 8.2; Amended Coun. J. 9-27-07, p. 9208, § 1; Amend Coun. J. 2-9-11, p. 112149, § 10; Amend Coun. J. 11-13-13, p. 65239, § 1; Amend Coun. J. 4-10-19, p. 100029, Art. II, § 100; Amend Coun. J. 10-7-20, p. 21791, Art. VII, § 8; Amend Coun. J. 10-27-21, p. 39543, Art. VI, § 2; Amend Coun. J. 10-27-21, p. 40504, Art. II, § 9; Amend Coun. J. 11-7-22, p. 54948, Art. III, § 6; Amend Coun. J. 11-15-23, p. 6542, Art. V, § 10)
The annual fee for filing a permit application shall be as follows:
For facilities on lots covering not more than 25 acres.....$2,500.00
For facilities on lots covering more than 25 and up to 50 acres.....$5,000.00
For facilities on lots covering more than 50 acres.....$10,000.00
Each noncontiguous lot shall be considered a separate facility.
(Added Coun. J. 6-23-93, p. 34796; Amend Coun. J. 12-4-02, p. 99931, § 8.3)