943.20 PERMIT CONDITIONS.
   Industrial Wastewater Discharge Permits shall specify no less than the following:
   (a)   Fees and charges to be paid upon initial permit issuance;
   (b)   Limits on the average and maximum wastewater constituents and characteristics regulated thereby;
   (c)   Limits on average and maximum rate and time of discharge and/or requirements for flow regulations and equalization;
   (d)   Requirements for installation and maintenance of inspection and sampling facilities;
   (e)   Special conditions as the City may reasonably require under particular circumstances of a given discharge including sampling locations, frequency of sampling, number, types and standards for tests and reporting schedule;
   (f)   Compliance schedules which shall be in accordance with the content requirements, conditions and time frames as set forth in Section 943.18(a)(9);
   (g)   Requirements for submission of special technical reports or discharge reports where same differ from those prescribed by this chapter.
      (Ord. 182-91. Passed 11-18-91.)