(a) Filing. The subdivider shall prepare and file eight (8) copies of a preliminary plat, according to the standards and other requirements of these Regulations, and submit the filing fee (see Section 1115.06), not less than fifteen (15) working days prior to the Commission's regularly scheduled meeting date. The preliminary plat shall be prepared by a registered surveyor.
(b) Approval. The Commission shall forward copies of the preliminary plat to such officials and agencies as may be necessary for the purpose of study and recommendation. After receipt of reports from such officials and agencies, the Commission shall determine whether the preliminary plat shall be approved, approved with modifications, or disapproved. Notice of such action shall be supplied to the subdivider, and if disapproved or modified, the reasons for disapproval or modification.
(1) The Commission shall act on the preliminary plat within thirty (30) days after filing unless such time is extended by agreement with the subdivider or his agent.
(2) The Commission will notify the subdivider if his presence is required at the meeting.
(3) When a preliminary plat has been approved by the Commission, the Chairman of the Commission shall affix his signature to the plat and attach thereto a notation that it has received preliminary approval and return one (1) copy to the subdivider for compliance with final plat requirements of these subdivision regulations.
(4) Preliminary approval shall confer upon the subdivider the rights and guarantees for a one year period from the date of approval, that the general terms and conditions under which the preliminary approval was granted will not be affected by any changes and/or amendments to these Regulations.
(Ord. 2001-13. Passed 3-21-01.)
(a) Form. The preliminary plat shall be clearly and legibly drawn. The size of the map shall be on permanent reproducible paper of a minimum size of 12" x 18" and the maximum size of 24" x 36", except in rare circumstances. All subdivision shall be drawn at a scale of not less than one (1) inch equals one hundred (100) feet, unless otherwise required by the Commission.
(b) Coverage. The preliminary plan shall include all land intended for ultimate development even though only a portion of the tract is to be initially recorded.
(c) Map Contents. The preliminary plat shall contain the following information:
(1) Residential Requirements.
A. The name by which the proposed subdivision will be known. The name shall not duplicate, be the same in spelling or alike in pronunciation with any other recorded subdivision in Mahoning County. Evidence of ownership of the land to be subdivided, together with the names, address and phone numbers of the owner(s), subdivider(s) and the surveyor preparing the plat, along with his registration number and seal, shall be shown.
B. The location of the subdivision by section number, great lot, township, county, state and other legally established district, corporation or unit.
C. The name of any abutting subdivision and the owners of the abutting property.
D. Locations, widths and names of existing streets, buildings, railroads, right-of-way, easements, parks, corporation, township location of wooded areas, natural water courses, and other significant topographic and natural features within the adjacent to the plat.
E. The location, width, name and approximate grade of proposed streets, lots, easements or other right-of-way. The location and width of sidewalks and storm drainage easements and the location and size of existing utility mains.
F. The approximate lot dimensions and lot numbers, the number of residential buildings and proposed dwelling units.
G. The results of the soil survey pertaining to the plat are including solid permeability data.
H. Information with respect to high water elevations in the vicinity of streams and the elevation of the maximum ground water table in cases where it is less than ten (10) feet from ground surface.
I. The contour and topographic conditions as follows: Where land slope is greater than fifteen (15%) percent, contours shall be shown at five (5) foot intervals. Where the land slope is between two (2%) percent and fifteen (15%) percent, contours shall be shown at two (2) foot intervals. Where the land slope is less than two (2%) percent, contours shall be shown at one (1) foot intervals. Elevations shall be based on sea-level datum as determined by the United States Coast and Geodetic Survey.
J. The zoning classifications, lot size and area requirements and the minimum building setback lines.
K. A statement with respect to the proposed use of lots, stating type of residential buildings with number of proposed dwelling units so as to reveal the effect of the development on traffic, fire hazards, and possible congestion of population with respect to protective covenants and deed restrictions.
L. Proposed sites that are to be dedicated or reserved for parks, playgrounds, schools or other public uses or open spaces.
M. The north arrow with a statement to the basis of the reference direction used, date and graphic scale shall be shown.
N. A street tree or other planted area plan, if approved by the developer.
O. If any zoning changes are contemplated by the subdivider, the proposed zoning shall be outlined.
P. If sewage disposal other than a tie into an existing Municipal Treatment Plant is proposed, the subdivider shall furnish a letter from the County Board of Health stating what type of sewage disposal will be approved. A central sewage treatment plant and a central water system shall be constructed by the subdivider when deemed necessary by the Commission and the appropriate Health Officer. If a central plant is not to be used, a proposal shall be included discussing the method and cost for the incorporation of said system into the general municipal or county system.
(2) Commercial and Industrial Requirements. The following items shall be shown on a preliminary plat of a subdivision intended for commercial or industrial use:
A. All of the items required by subsection (c)(1), if applicable.
B. A statement indicating the number of buildings and the type of operation proposed in each building and on the premises.
C. A preliminary site plan including proposed major features including a preliminary grading plan.
(Ord. 2001-13. Passed 3-21-01.)
(a) After receiving notice of the approval of the preliminary plat and prior to the filing of the final plat, the subdivider shall present to the Commission, one original and two copies of the detailed engineering drawings and specifications of all utility and street improvements to be constructed in the proposed subdivision as required by the City and/or County Standards. The Commission shall within five (5) days after the filing of the above engineering drawings and specifications transmit copies of same to the County Health Officer and the City Engineer for study and recommendations. The Commission, after receiving a report from the aforementioned officials, shall notify the subdivider may upgrade the engineering drawings and specifications. Subsequent to the final approval of Construction Drawings and Specifications, the subdivider may submit the final plat for approval. The engineering drawings and specifications shall be prepared by a registered professional engineer.
(b) Construction drawings shall be made with reproducible ink on a permanent reproducible material 24" x 36" in size and shall generally include the following items:
(1) Title Sheet
(2) Location Sketch
(3) Existing and Proposed Site Plan
(4) Grading Plan
(5) Typical Sections
(6) Plan and Profile
(7) Cross-Sections
(8) Summary of Quantities
(9) Design and Drainage Calculations and/or Storm Water Management Plan
(10) Erosion Control Plan
(11) Geometric Details
(12) Detail Drawings
(13) General Notes (Ex. Erosion Control)
Prior to Final Plat Approval, the subdivider shall submit permits from all required state, local or federal reviewing agencies.
(c) Record Drawings. The subdivider shall provide to the City original tracings of the record drawings of all constructed improvements before final certification in writing by the City Engineer. Failure to supply the record drawings may constitute withholding of the Subdivision Bond and/or approval of the final plat.
(d) Specifications. The subdivider shall be required to utilize the current City of Canfield specifications for all improvements within the jurisdiction of these Regulations.
(Ord. 2001-13. Passed 3-21-01.)
(a) General. The final plat will have incorporated all changes or modifications required by the Planning Commission; otherwise, it shall conform to the preliminary plat, and it may constitute only that portion of the approved preliminary plat which the subdivider proposes to record and develop at the time, provided that such portion conforms with all requirements of these Regulations. It shall contain the information required by Section 207.
(b) Filing.
(1) The final plat shall be filed not later than twelve (12) months after the date of approval of the preliminary plat; otherwise, it will be considered void unless an extension is requested in writing by the developer and granted by the Commission, in writing. The subdivider shall submit eight (8) copies of the final plat for approval.
(2) The final plat shall be filed not less than fifteen (15) working days prior to the Commission's regularly scheduled meeting at which it is to be considered. The appearance of the subdivider is required at the Commissioners Meeting.
(c) Approval.
(1) The Commission shall forward copies of the final plat to such officials and agencies as may be necessary for the purpose of final approval, subject to their aforemade recommendations to the preliminary plat. After receipt of approval from such officials and agencies the Commission shall take action on the final plat within thirty (30) days from the date of submittal.
(2) The subdivider shall be notified of the final approval of the plat by the Commission and said approval shall be endorsed in writing on the plat. The Commission shall then present the plat to Council for final approval.
(3) If the subdivider elects to construct the improvements without a subdivision bond, final plat approval will not be issued until satisfactory completion of all the improvements. If the subdivider elects to post a subdivision bond, final plat approval by council may be issued upon the receipt of the bond and execution of the Subdivider's Agreement. The subdivider electing to construct without a bond shall execute a subdivider's agreement with Council before proceeding with construction.
(4) After approval by Council, subdivider has two (2) years to gain acceptance by Council or no additional permits shall be issued.
(Ord. 2001-13. Passed 3-21-01.)
(5) This approval authorizes the developer to:
A. Record the lots;
B. Sell lots;
C. Commence subdivision improvements.
This approval does not authorize issuance of zoning, building, water or sewer permits for structures within the subdivision. These zoning, building, water and sewer permits may be issued only after the City Engineer has issued a certificate of substantial completion for all improvements within the subdivision, as approved by the Zoning Inspector.
(Ord. 2002-05. Passed 3-20-02.)