Skip to code content (skip section selection)
Compare to:
Canfield Overview
Codified Ordinances of Canfield, OH
CHAPTER 1107
Procedures
1107.01   Consultation and pre-application sketch.
1107.02   Submission to State Department of Transportation.
1107.03   Submission and approval of preliminary plat.
1107.04   Preliminary plat contents and supplementary information.
1107.05   Construction drawings and specifications.
1107.06   Approval of final plat.
1107.07   Final plat contents.
1107.08   Replat and correction plat; fee for minor subdivision replat.
 
CROSS REFERENCES
Plat and contents - see Ohio R.C. 711.01 et seq.
Plat acknowledgment and recording - see Ohio R.C. 711.06
Approval by Planning Commission - see Ohio R.C. 711.09
 
1107.01 CONSULTATION AND PRE-APPLICATION SKETCH.
(a)   Informal Consultation. While the subdivision is in sketch form and prior to the preparation of the preliminary or final plat, the subdivider shall consult with the Commission and the County Board of Health so that he may know of the applicable provisions of (1) these Regulations; (2) the official Thoroughfare Plan, (3) the Canfield Comprehensive Plan, (4) existing zoning regulations, and (5) utility requirements.
Such sketch plan may be in pencil but shall:
      (1)   Show the proposed layout and the approximate acreage, the number of lots, contemplated business area, playgrounds and park areas.
      (2)   On a general area map, show the proposed boundary in relation to existing community facilities, public highways, transportation facilities, shopping centers, schools and existing zoning.
      (3)   Indicate utilities and services, if available, and the source and supply of water, sewerage disposal, storm water disposal methods and proposed street improvements.
      (4)   Include topographic data sufficient to evaluate the proposed plan and an approximate scale, title, north point, date, name, address and phone number of the owner and/or developers.
(b)   Subdivision Type Determination. Upon approval of the pre-application sketch the commission shall determine at this time if the proposed development will be processed as a minor or major subdivision . A minor subdivision shall proceed to be processed as a final plat. A major subdivision shall proceed to be processed in the preliminary plat, final plat sequence.
(Ord. 2001-13. Passed 3-21-01.)
1107.02 SUBMISSION TO THE STATE DEPARTMENT OF TRANSPORTATION.
Before any plat is approved affecting any land within three hundred (300) feet of the centerline of the proposed new highway or a highway for which changes are proposed as described in the certification to local officials by the Director of the State Department of Transportation of any land within a radius of five hundred (500) feet from the point of intersection of said centerline with any public road or highway, the Commission shall give notice by registered or certified mail to the director of the State Department of Transportation. The Commission shall not approve the plat for one hundred twenty (120) days from the date the notice is received by the State Transportation Director. If the State Transportation Director notifies the Commission that he shall proceed to acquire the land needed, then the Commission shall refuse to approve the plat. If the State Transportation Director notifies the Commission the acquisition at this time is not in the public interest or upon the expiration of the one hundred twenty (120) day period or any extensions thereof agreed upon by the State Transportation Director and the property Owner, the Commission shall, if the plat is in conformation to all existing regulations, approve the plat (O.R.C. Section 5511)
(Ord. 2001-13. Passed 3-21-01.)
1107.03 SUBMISSION AND APPROVAL OF PRELIMINARY PLAT.
(a)   Filing. The subdivider shall prepare and file eight (8) copies of a preliminary plat, according to the standards and other requirements of these Regulations, and submit the filing fee (see Section 1115.06), not less than fifteen (15) working days prior to the Commission's regularly scheduled meeting date. The preliminary plat shall be prepared by a registered surveyor.
(b)   Approval. The Commission shall forward copies of the preliminary plat to such officials and agencies as may be necessary for the purpose of study and recommendation. After receipt of reports from such officials and agencies, the Commission shall determine whether the preliminary plat shall be approved, approved with modifications, or disapproved. Notice of such action shall be supplied to the subdivider, and if disapproved or modified, the reasons for disapproval or modification.
      (1)   The Commission shall act on the preliminary plat within thirty (30) days after filing unless such time is extended by agreement with the subdivider or his agent.
      (2)   The Commission will notify the subdivider if his presence is required at the meeting.
      (3)   When a preliminary plat has been approved by the Commission, the Chairman of the Commission shall affix his signature to the plat and attach thereto a notation that it has received preliminary approval and return one (1) copy to the subdivider for compliance with final plat requirements of these subdivision regulations.
      (4)   Preliminary approval shall confer upon the subdivider the rights and guarantees for a one year period from the date of approval, that the general terms and conditions under which the preliminary approval was granted will not be affected by any changes and/or amendments to these Regulations.
(Ord. 2001-13. Passed 3-21-01.)
Loading...