Section
General Provisions
53.001 Definitions
53.002 Abbreviations
53.003 User classes
53.004 Determining discharge into the sewer system
Public Sewer Usage Requirements
53.015 Purpose and policy
53.016 Unlawful disposal
53.017 Disposal boundaries
53.018 Forbidden sewage facilities
53.019 Required waste facilities and sewer connections
53.020 Hauled liquid waste
Private Sewage Disposal Systems
53.035 Private connection requirements
53.036 Building sewer connection permits
53.037 Private sewage disposal system permit procurement
53.038 Construction inspection
53.039 Construction compliance
53.040 Governing authority
53.041 Maintenance responsibility
53.042 Subsequent sewer availability
Discharge Regulations and Requirements
53.055 Unpolluted discharge
53.056 Governing standards
53.057 Prohibited discharge standards
53.058 Grease, oil and sand interceptors
53.059 Pretreatment requirements
53.060 Approval of treatment facilities
53.061 Required treatment facilities maintenance
53.062 Superintendent’s authority
53.063 Town’s right to amend
53.064 Diluted discharge prohibition
53.065 Responsibility for hazardous and accidental spills
53.066 Control of acceptable wastes
53.067 Special agreement
53.068 Regulation of waste received from other jurisdictions
Building Sewer Connections and Construction
53.080 Permit requirement
53.081 Permit application
53.082 Financial responsibility
53.083 Separate building sewer provision
53.084 Old building sewer use
53.085 Materials for sewer
53.086 Size and slope of sewer
53.087 Placement of sewer
53.088 Construction methods and testing requirements
53.089 Excavations
53.090 Sewer joints and connections
53.091 Location of sewer connection
53.092 Notification for testing and inspection
53.093 Excavation of public property
53.094 Record drawings
53.095 Sewer construction and prohibited connections
53.096 Cleanouts
Sewer Construction
53.110 Connection permit required
53.111 Permit application
53.112 Inspection fee
53.113 General connection fee
53.114 Multiple-dwelling connection fee
53.115 Determination of hook-on fees
53.116 Hook-on fee for industrial, commercial or nonresidential users
53.117 Increase in water meter size
53.118 Owner to pay installation cost
53.119 Owner to indemnify town for loss
53.120 Each building to have sewer connection
53.121 Use of old building sewers
53.122 Size and slope requirements
53.123 Service sewer miscellaneous requirements
53.124 Lack of gravity flow
53.125 Open trench excavations required
53.126 Joints generally
53.127 Superintendent to supervise connection
53.128 Excavation safety precautions
53.129 Damage to public property
Rates, Charges, Fees and Fines
53.140 Sewage rates; basis for determining; surcharges
53.141 Study of rates
53.142 Determination of hook-on fee
53.143 General sewer hook-on fee
53.144 Multiple dwelling hook-on fee
53.145 Industrial, commercial or nonresidential user hook-on fee
53.146 Increase in water meter size; effect on charge
53.147 Industrial pretreatment program fee
53.148 Hauled liquid waste fee
53.149 Inspection fee
53.150 Groundwater remediation discharge fee
53.151 Administrative fines; disputing fines
Billing and Payment
53.165 Monthly billing
53.999 Penalty
Appendix A: Sewer Line Construction Permit Form
Appendix B: Schedule of Sewer Rates and Charges