§ 53.087 PLACEMENT OF SEWER.
   Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. No building sewer shall be laid parallel to or within three feet of any bearing wall. The depth shall be sufficient to afford protection from frost. The building sewer shall be laid at a uniform grade and in straight alignment insofar as possible. Changes in direction shall be made only with proper pipe fittings. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by the drain shall be lifted by approved artificial means and discharged into the building sewer. All costs for installation, operation and maintenance shall be the responsibility of the owner.
(Ord. 7-2010, passed 11-22-2010)