(A) The building sewer beginning two feet from any building or structure shall be of such materials as approved by the town in its sewer installation specifications. Any part of a building sewer located within ten feet of a water service pipe shall be constructed of ductile iron pipe within that limiting distance.
(B) Ductile iron pipe may be required by the Superintendent or Manager (Inspector) where the building sewer is exposed to damage by tree roots or being installed over fill or in unstable ground.
(Ord. 7-2010, passed 11-22-2010)