(A) All joints and connections shall be made utilizing methods and materials approved in the town’s sewer installation specifications. All such connections shall be made gastight and watertight.
(B) Any deviation from the prescribed procedures and materials must be approved by the Superintendent or Manager (Inspector) before installation.
(Ord. 7-2010, passed 11-22-2010)