Loading...
§ 53.999 PENALTY.
   (A)   Any person violating any provision of this chapter for which no specific penalty is prescribed shall be subject to § 10.99 of this code of ordinances.
   (B)   (1) As set out in § 53.151 of this chapter, when the Superintendent finds that a user has violated, or continues to violate, any provision of this chapter, an individual wastewater discharge permit or order issued hereunder or any other pretreatment standard or requirement, the Superintendent may fine such user in an amount not to exceed $2,500. Such fine shall be assessed on a per-violation, per-day basis. In the case of monthly or other long-term average discharge limits, fines shall be assessed for each day during the period of violation.
      (2)   Unpaid charges, fines and penalties shall, after 180 calendar days, be assessed an additional penalty of 10% of the unpaid balance, and interest shall accrue thereafter at a rate of 1% per month. A lien against the user’s property shall be sought for unpaid charges, fines and penalties.
(Ord. 3-2019, passed 8-12-2019)
APPENDIX A: SEWER LINE CONSTRUCTION PERMIT FORM
 
Permit # ______
   TOWN OF BREMEN
   SEWER LINE CONSTRUCTION
   PERMIT
 
Date ______________________
 
Name of Applicant: ______________________________
Address: _______________________________________
___________________________________________
Phone Number __________________________________
 
Address where construction is to take place (if different than above).
______________________________________________________________
 
 
Purpose of Construction, Check One – Replacement Sewer Line ________
New Sewer Line ________ Relocate Sewer Line ________
 
Other (describe) _______________________________________
 
What size pipe is being constructed or replaced? ________
 
What type of sewer line material will be used?
 
Plastic ________ (circle one) Sch 35 or Sch 40      Vitrified Pipe ________
Plastic Pressure Pipe ________ (circle one) SDR 26 or SDR 21
Ductile Iron ________
 
When is Construction Scheduled to Take Place?
 
Date _________________________
 
Diagram Project, show Streets, lot, Building on Lot and where construction will take place.
Use the backside of this form.
 
Date Reviewed __________________
Approved ________         Denied ________   Reason Denied __________________
______________________________________________________________
By __________________________
 
For Inspection call 546-4324
 
(Prior Code, Ch. 100)
APPENDIX B: SCHEDULE OF SEWER RATES AND CHARGES
   (A)   Metered rate per 1,000 gallons.
 
User Type
Rate per 1,000 Gallons
All users
$5.22
 
   (B)   Base rate per month.
Meter Size
Rate
Meter Size
Rate
5/8-in. – 3/4-in.
$9.05
1-in.
$20.35
1 and 1/4-in.
$31.90
1 and 1/2-in.
$45.80
2-in.
$77.80
3-in.
$177.35
4-in.
$315.25
6-in.
$706.65
 
   (C)   Tap fees.
 
Type
   Fee
Commercial
$1,000
Industrial
$1,500
Residential
$600
 
   (D)   Disconnection/reconnection fee. The fee for disconnection/reconnection for all utility services shall be $75 during normal business hours, and the utility shall only perform reconnections during normal business hours.
   (E)   After hours service charge (non-emergency only).
      (1)   (a)   After hours and Saturdays: $70 minimum for first two hours; and
         (b)   After two hours: An additional $35 per hour per employee.
      (2)   (a)   Sundays and holidays: $90 minimum for first two hours; and
         (b)   After two hours: An additional $45 per hour per employee.
(Ord. 13-2018, passed 2-25-2019; Ord. 9-2021, passed 5-24-2021)