Loading...
(A) Any person violating any provision of this chapter for which no specific penalty is prescribed shall be subject to § 10.99 of this code of ordinances.
(B) (1) As set out in § 53.151 of this chapter, when the Superintendent finds that a user has violated, or continues to violate, any provision of this chapter, an individual wastewater discharge permit or order issued hereunder or any other pretreatment standard or requirement, the Superintendent may fine such user in an amount not to exceed $2,500. Such fine shall be assessed on a per-violation, per-day basis. In the case of monthly or other long-term average discharge limits, fines shall be assessed for each day during the period of violation.
(2) Unpaid charges, fines and penalties shall, after 180 calendar days, be assessed an additional penalty of 10% of the unpaid balance, and interest shall accrue thereafter at a rate of 1% per month. A lien against the user’s property shall be sought for unpaid charges, fines and penalties.
(Ord. 3-2019, passed 8-12-2019)
Permit # ______ TOWN OF BREMEN SEWER LINE CONSTRUCTION PERMIT Date ______________________ Name of Applicant: ______________________________ Address: _______________________________________ ___________________________________________ Phone Number __________________________________ Address where construction is to take place (if different than above). ______________________________________________________________ Purpose of Construction, Check One – Replacement Sewer Line ________ New Sewer Line ________ Relocate Sewer Line ________ Other (describe) _______________________________________ What size pipe is being constructed or replaced? ________ What type of sewer line material will be used? Plastic ________ (circle one) Sch 35 or Sch 40 Vitrified Pipe ________ Plastic Pressure Pipe ________ (circle one) SDR 26 or SDR 21 Ductile Iron ________ When is Construction Scheduled to Take Place? Date _________________________ Diagram Project, show Streets, lot, Building on Lot and where construction will take place. Use the backside of this form. Date Reviewed __________________ Approved ________ Denied ________ Reason Denied __________________ ______________________________________________________________ By __________________________ For Inspection call 546-4324 |
(Prior Code, Ch. 100)
(A) Metered rate per 1,000 gallons.
User Type
|
Rate per 1,000 Gallons
|
All users | $5.22 |
(B) Base rate per month.
Meter Size
| Rate |
Meter Size
| Rate |
5/8-in. – 3/4-in. | $9.05 |
1-in. | $20.35 |
1 and 1/4-in. | $31.90 |
1 and 1/2-in. | $45.80 |
2-in. | $77.80 |
3-in. | $177.35 |
4-in. | $315.25 |
6-in. | $706.65 |
(C) Tap fees.
Type
| Fee |
Commercial | $1,000 |
Industrial | $1,500 |
Residential | $600 |
(D) Disconnection/reconnection fee. The fee for disconnection/reconnection for all utility services shall be $75 during normal business hours, and the utility shall only perform reconnections during normal business hours.
(E) After hours service charge (non-emergency only).
(1) (a) After hours and Saturdays: $70 minimum for first two hours; and
(b) After two hours: An additional $35 per hour per employee.
(2) (a) Sundays and holidays: $90 minimum for first two hours; and
(b) After two hours: An additional $45 per hour per employee.
(Ord. 13-2018, passed 2-25-2019; Ord. 9-2021, passed 5-24-2021)