(A) Cleanouts equal in size to the building sewer shall be required at the following locations:
(1) At the outside junction of building drain and building sewer;
(2) A change of direction greater than 45 degrees; and
(3) At locations at not more than 100 lineal feet intervals.
(B) The cleanout shall be installed to open in the direction of the flow of the drainage pipe or at a right angle thereto.
(C) Each cleanout shall be adjusted flush with the finish grade and sealed with a suitable cap or plug.
(Ord. 7-2010, passed 11-22-2010)