Skip to code content (skip section selection)
Compare to:
Boise Overview
Boise, ID Code of Ordinances
CITY CODE of BOISE CITY, IDAHO
ORDINANCES PENDING REVIEW FOR CODIFICATION
ADOPTING ORDINANCE
TITLE 1 ADMINISTRATION
TITLE 2 BOARDS, COMMISSIONS, COMMITTEES
TITLE 3 LICENSES AND PERMITS
TITLE 4 HEALTH AND SANITATION
TITLE 5 PUBLIC SAFETY
TITLE 6 MOTOR VEHICLES AND TRAFFIC
TITLE 7 PUBLIC WAYS AND PROPERTY
TITLE 8 AIRPORT
TITLE 9 BUILDING CODES AND REGULATIONS
TITLE 10 PUBLIC UTILITIES
TITLE 11 DEVELOPMENT CODE
PARALLEL REFERENCES
Loading...
10-6-2-5: CONSTRUCTION SITES:
Any person performing construction work in the City shall comply with the provisions of this chapter and title 9, chapter 14, "Construction Site Erosion Control", of this Code. (1952 Code § 8-15-02.05)
10-6-2-6: NONSTORMWATER USE OF STORM DRAINS:
The City nonstormwater disposal Best Management Practices establishes minimum requirement for nonstormwater storm drain uses within the City and is incorporated by reference and made part of this chapter. Discharges from the following activities will be allowed, subject to application of the City nonstormwater disposal Best Management Practices: water line flushing and other discharges from potable water sources; landscape irrigation and lawn watering; irrigation water; diverted stream flows; rising groundwaters; uncontaminated groundwater infiltration to storm drains; uncontaminated pumped groundwater; foundation and footing drains; roof drains; water from crawl space pumps; residential air conditioning condensation; springs; individual residential car washes; flows from riparian habitats and wetlands; dechlorinated swimming pool discharges; or flows from firefighting activities and training. (1952 Code § 8-15-02.06)
10-6-2-7: DISCHARGE PURSUANT TO NPDES PERMIT:
The prohibition of discharges shall not apply to any discharge regulated under an NPDES permit issued and administered by the EPA; provided, that the discharger is in full compliance with all requirements of the permit and other applicable laws or regulations. Compliance with an applicable NPDES permit governing discharges into the MS4 shall be considered compliance with this chapter. (1952 Code § 8-15-02.07)
10-6-2-8: COMPLIANCE WITH NPDES PERMIT:
   A.   Any discharge that would cause a violation of a Municipal NPDES permit, and any amendments, revisions or reissuance thereof, either separately considered or when combined with other discharges, is prohibited. Liability for any such discharge shall be the responsibility of the person causing or responsible for the discharge, and the City shall seek to have such persons defend, indemnify and hold harmless the City in any administrative or judicial enforcement action against the permit holder relating to such discharge as provided by applicable rules of law.
   B.   All persons in charge of a facility are to comply with applicable Federal and State laws, including facility personnel, training, training record maintenance, training records, maintenance of notification procedures, and implementation of notification requirements for spill response to assure containment, clean up and immediate notification to the owner and operator of the MS4.
   C.   Individuals responsible for spills are to comply with applicable State and Federal notification requirements to assure containment, clean up and immediate notification to the owner and operator of the MS4. (1952 Code § 8-15-02.08)
10-6-3: STORMWATER MANAGEMENT PLANS AND COMPREHENSIVE DRAINAGE PLANS:
10-6-3-1: REQUIREMENTS:
To minimize the discharge and transport of pollutants to storm drains and prevent the deterioration of water quality, certain new developments and redevelopment projects will be required to submit for approval a stormwater management plan or a comprehensive drainage plan to control the quality, volume and rate of stormwater runoff. The City Stormwater Management Design Manual establishes standards and guidelines for implementing BMPs and stormwater management plans and is incorporated by reference and made part of this chapter.
   A.   Plans Required: Stormwater management plans or comprehensive drainage plans are required for industrial, commercial and institutional developments which require a building permit and multi-family residential developments that are not part of a larger subdivision project, as well as subdivision projects that have private access, which also require a building permit.
   B.   Redevelopment Projects: Redevelopment projects may be required to submit complete stormwater management plans or operation and maintenance plans if they meet the criteria found in the City Stormwater Design Manual.
   C.   Included Provisions Of Plans: Stormwater management plans and comprehensive drainage plans shall provide for the following:
      1.   Prevention of any direct discharge of untreated stormwater and nonstormwater, either on or off site.
      2.   Prevention of increased post development discharge rates.
      3.   Removal of a minimum amount, determined by the percentage of impervious parcel area, of annual total suspended solids generated from development or redevelopment runoff prior to any off site discharge.
      4.   Continuation of BMPs for appropriate periods of time.
      5.   Protection of groundwater from instances of development runoff infiltration.
   D.   Plan Development: Stormwater management plans and comprehensive drainage plans shall be developed in accordance with the City Stormwater Management Design Manual or equivalent, and shall include:
      1.   Site evaluation.
      2.   Drainage system report.
      3.   Peak flow rates and runoff volume calculations.
      4.   Safety requirements.
      5.   Grading plans.
      6.   Operation and maintenance plan.
      7.   All other necessary BMPs not covered in the areas listed above.
   E.   Certification Required: All drainage system reports, peak flow rates and runoff volume calculations, safety requirements and grading plans shall be certified by a licensed professional authorized by the State to perform such functions.
   F.   Conceptual Plans Not Considered: Drainage plans that are conceptual only, without engineering specifications, shall not be considered as comprehensive drainage plans.
   G.   Minimum Requirements For Drainage Systems: Drainage systems shall have the following minimum requirements:
      1.   Designed to provide primary conveyance for runoff from a 50-year frequency storm on sites with less than fifteen percent (15%) slope or a 100-year frequency storm on sites with greater than fifteen percent (15%) slope.
      2.   Designed to provide secondary conveyance for runoff for all flows up to the 100-year frequency storm, within defined rights-of-way or drainage easements.
      3.   Designed to prevent an increase of peak flows at any location for the 2-year, 10-year, 25-year and 100-year frequency storm which could cause increased inundation of any building or roadway surface.
      4.   Achievement of peak flow regulation by on site discharge, off site discharge with permission or participation in an approved regional stormwater management facility.
   H.   Amendments, Modifications: The City Council reserves the right to amend, modify and/or add requirements to the City Stormwater Management Design Manual. The design manual references in this chapter shall be to the most currently adopted version. (1952 Code § 8-15-03.01)
Loading...