§18-410.   Removal of Holding Tank.
   1.   In the event a holding tank permit has been issued for new construction pending the installation of a permanent sewage disposal system, the landowner shall remove or cause the removal of the privy within 20 days after the use of the permanent sewage disposal system is made available to the landowner; and, shall connect with the permanent disposal system in the same time.
   2.   Borough, at its election, shall have the right to enter upon the premises of a landowner for the purpose of removing or causing the removal of any holding tank which remains in place in violation of this Part. All costs and expenses of removal shall be borne by the landowner.
(Ord. 341, 9/4/1990, §10)