8-4-11: EXPENDITURES:
The following are acceptable uses of any user fee revenues or other funds allocated by the city to the stormwater management program or for stormwater drainage systems or facilities. The following list is not exhaustive:
   A.   NPDES permit fees.
   B.   Development of public outreach and education materials.
   C.   Costs associated with public involvement and participation related to the stormwater management program.
   D.   Stormwater policy development assistance.
   E.   Illicit discharge detection elimination procedures, equipment, testing and investigation.
   F.   Water collection and sampling fees and related equipment.
   G.   Planning, design, engineering, construction, inspection, maintenance, operation, and improvement of drainage services, facilities and structures, which shall include, but are not limited to, conduits, drains, manholes, stormwater detention devices, flow impediments, ponds, ditches, sloughs, streams, filter strips, ripraps, and erosion control devices.
   H.   Construction site and postconstruction site plan review and inspection costs.
   I.   Staff time related to the stormwater management program.
   J.   Employee training.
   K.   Costs associated with capital improvements to stormwater drainage systems and facilities.
   L.   Consulting fees related to the stormwater management program and construction of stormwater related projects.
   M.   Costs associated with watershed assessment.
   N.   Street sweeping costs. (Ord. 4980, 12-14-2009)