Each application for the extension of a water line outside the City limits shall be accompanied by a fee of one hundred dollars ($100.00), as a minimum charge to reimburse the Division of Water for costs incurred in making studies necessary to determine that plans, specifications and materials to be used in the construction of the water line extension, meet the requirements of the Division of Water, and for making the studies necessary to the effect of such extension upon the waterworks system in service, and the engineering feasibility of such extension and reporting on the same. The one hundred dollar ($100.00) fee shall be a minimum charge. Any additional costs incurred, equal to direct labor and material costs plus current additives and overhead, shall be paid before the extension is approved.
(1952 Code § 27-2-6; Ord. 103-70)