Skip to code content (skip section selection)
Compare to:
Sylvania Overview
Codified Ordinances of Sylvania, OH
CODIFIED ORDINANCES OF THE CITY OF SYLVANIA, OHIO
CERTIFICATION
ROSTER OF OFFICIALS
ADOPTING ORDINANCE NO. 26-79
EDITOR'S NOTE
COMPARATIVE SECTION TABLE
TABLES OF SPECIAL ORDINANCES
CHARTER
PART ONE - ADMINISTRATIVE CODE
PART THREE - TRAFFIC CODE
PART FIVE - GENERAL OFFENSES CODE
PART SEVEN - BUSINESS REGULATION CODE
PART NINE - STREETS, UTILITIES AND PUBLIC SERVICES CODE
TITLE ONE - Street and Sidewalk Areas
TITLE THREE - Utilities
CHAPTER 921 Water Regulations
CHAPTER 922 Cross Connection Control and Water Quality Protection
CHAPTER 923 Water Service Charges
CHAPTER 925 Sewage Service Charges
CHAPTER 929 Sewer Regulations
CHAPTER 930 Illicit Discharge and Illegal Connection Control
CHAPTER 931 Sediment and Erosion Control
CHAPTER 932 Stormwater Management Plan
CHAPTER 933 Subsurface Wiring
TITLE FIVE - Other Public Services
PART ELEVEN - PLANNING AND ZONING CODE
PART THIRTEEN - BUILDING CODE
PART FIFTEEN - FIRE PREVENTION CODE
Loading...
929.07 APPLICATION FOR PERMIT.
   (a)    All applications for permits shall be made in writing by the parties employed to do the work, and shall be accompanied by the signatures of the owners of the premises for whose benefit the application is made, or by their authorized agents or attorneys and shall contain all information requested by the Director.
   (b)    The Director is hereby authorized and directed to receive applications for and issue sewer connection permits under the provisions of this chapter.
   (c)    Upon receipt of a connection application, the Director shall consult his records with regard to the sewer or drain desired to be connected with. If such connection can be made, the Director shall give such applicant the location at which the connection is to be made. The Director shall give to the applicant a permit stating that permission is granted to connect with such sewer or drain and also state in such permit the name of the street and the abutting lot number. All permits shall be issued by the Director. Permits for connection to the sewer system shall be issued dependent on the Director's determination that there is or will be capacity available in all downstream sewers, lift stations, force mains, and the sewage treatment plant including capacity for BOD, SS, and phosphorus.
(Ord. 106-77. Passed 12-7-77; Ord. 48-2019. Passed 5-20-19.)
929.08 PERMIT FEE.
   Effective on and after July 1, 2019, there is hereby established a fee of $250 payable to the City for each sewer connection permit for the cost of inspection services. Excessive construction time or contractor caused delays may result in additional charges. The contractor shall be informed at the time of such charges.
(Ord. 75-79. Passed 8-20-79; Ord. 48-2019. Passed 5-20-19.)
929.09 NO PERMIT TO BE GRANTED OUTSIDE SANITARY SEWER DISTRICT SERVICE AREA.
   No permit to connect, either directly or indirectly, into a sanitary sewer of the City shall be issued by any official of the City, to any person if the lot or lots or lands to be connected with such sanitary sewer are in whole or in part outside of the sanitary sewer district service area, but the Director may issue such permits even though the lots or lands so to be connected are outside of the territorial limits of the City, if they are wholly within such service area.
(Ord. 106-77. Passed 12-7-77; Ord. 48-2019. Passed 5-20-19.)
929.10 SANITARY SEWER CONNECTION CHARGES, IN ADDITION TO SEWER PERMIT FEES AND SEWAGE SERVICE CHARGES.
   (a)    There shall be paid to the City a sanitary sewer connection charge for each
connection of a new building, addition or alteration to buildings causing increased sewage
discharge, such amounts and under such circumstances, as hereinafter set forth.
   The City of Sylvania connection Fee of $2.50 per gallon per day will be assessed based on Ohio Administrative Code 3745-42-05 in the following manner:
PLACE
SEWAGE FLOW, GALLONS PER DAY
Single Family Residence
400 per unit
Apartments and Condominiums
120 per bedroom
Assembly/Banquet Halls
5 per seat
Barber Shop
80 per basin
Beauty Shop
200 per basin
Bowling Alleys (No food service)
75 per lane
Car Wash
Contact City
Churches (no kitchen)
4 per sanctuary seat
Churches (large, w/kitchen)
6 per sanctuary seat
Convenience Store
15 per employee
Country Clubs
50 per individual (occupancy limit)
Doctors/Dentists
75 per doctor
35 per employee
10 per patient (seen daily)
Industrial Facility
30 per employee
Food Service Operations-
Restaurant/Tavern (non 24 hr)
24 - hour Restaurant
Restaurant along Freeway
Curb Service (Drive-In)
35 per seat
60 per seat
100 per seat
40 per car space
Gas Station
500 per pump island
Hospitals (No resident personnel)
300 per bed
Hotels/Motels
100 per unit
Institutions (residents)
100 per bed
35 per employee
Laundries (coin-operated)
400 per machine (standard size)
Mobile Home Parks
300 per space
Nursing and Rest Homes
200 per bed
50 per employee
Office Buildings
20 per employee
PLACE
SEWAGE FLOW, GALLONS PER DAY
Schools
Elementary
High and Junior High
15 per employee
15 per pupil
20 per pupil
Service Stations
500 per service bay
Service Stations w/Store
20 per employee
Shopping Centers/Retail
15 per employee
3 per parking space
Swimming Pool
10 per swimmer
Theater
5 per seat
Youth and Recreation Camps
50 per employee and camper
Veterinarian/Animal Hospital
100 per doctor
15 per employee
20 per run and cage
Note: There shall be a minimum Connection Fee of $1,000.00 for all commercial and/or industrial facilities
   (b)   There shall be paid to the City, as a sanitary sewer connection charge, for each connection of a main building in areas abutting the wastewater treatment works grant No. C-390691-03 Step 3 project (Phase II Sanitary Sewer Project), such amounts and under such circumstances, as hereinafter set forth, as follows:
      (1)   For inside City connection, the land being served by which has not been assessed by Phase II sanitary sewers, twenty-five dollars and ninety-four cents ($25.94) per front foot of the land on which such main building is located.
      (2)   For outside City connections, sixty-eight dollars and twenty-five cents ($68.25) per front foot of the land on which such main building is located.
   (c)   The connection charges set forth in subsection (a) and (b) hereof are exclusive of, and in addition to, the permit fee established by Section 929.08.
   (d)   All connection charges received pursuant to this section shall be deposited in the Sewer Revenue Fund.
   (e)   The Charges for connections outside the City for any real estate included in a territory sought to be annexed to the City by a petition on file in the office of the Clerk-Auditor, when such petition is not being delayed or opposed by any of the owners of real estate in the territory, shall be as specified above for inside City connections.
   (f)   The above connection charges are effective on and after July 1, 2019.
(Ord. 74-80. Passed 10-20-80; Ord. 48-2019. Passed 5-20-19.)
CONNECTION PROCEDURE
929.11 COMMENCEMENT OF WORK: NOTICE REQUIRED. (DELETED
   EDITOR’S NOTE: Former Section 929.11 was deleted by Ordinance 48-2019, passed May 20, 2019.
929.12 SUPERVISION OF ENTIRE JOB REQUIRED WHEN NO JUNCTION IS LEFT IN PIPE. (DELETED)
   EDITOR’S NOTE: Former Section 929.12 was deleted by Ordinance 48-2019, passed May 20, 2019.
929.13 SUPERVISION OF CONNECTION; EXPENSES. (DELETED
   EDITOR’S NOTE: Former Section 929.13 was deleted by Ordinance 48-2019, passed May 20, 2019.
929.14 COMPLETION AND ACCEPTANCE OF WORK. (DELETED)
   EDITOR’S NOTE: Former Section 929.14 was deleted by Ordinance 48-2019, passed May 20, 2019.
Loading...