Loading...
Any person, firm or corporation desiring to do business as a sewer builder in the City shall file with the Director an application furnished by him, together with a surety bond, acceptable to the Director in the amount of ten thousand dollars ($10,000) made payable to or in favor of the City, conditioned that he shall indemnify and save harmless the City from all accidents and the consequences thereof, and also from all damages caused by any negligence in protecting his work, or by any unfaithful, imperfect, inadequate, careless or unskilled work done by him, and that he shall also at the proper time promptly restore and replace the sidewalk, pavement, or street surface over any excavation he may have made to as good a state and condition as he found it previous to opening the same, and to keep and maintain the same in good order, to the satisfaction of the sewer inspector designated by the Director, for the period of twelve months next thereafter, and that he shall pay all fines imposed on him for a violation of any ordinance, rule or regulation prescribed by the City. He shall also submit with such application, proof of comprehensive general liability insurance with minimum and maximum limits in an amount satisfactory to the City. The sum of twenty-five dollars ($25.00) must be deposited with the application as payment for the annual charge for license as a sewer builder in the City. No license shall be granted for more than one year, and all licenses shall be granted to expire December 31.
(Ord. 58-2014. Passed 1-5-15; Ord. 48-2019. Passed 5-20-19.)
CONNECTION PERMITS
No connection shall be made with any public sewer or drain within the City without the written permission of the Director, and every connection or opening made into any public sewer or drain without such permission or in any manner different from the mode herein prescribed for such opening or connection shall subject the person making the same, and the owner of the premises directing it, to a penalty as provided in Section 929.99.
(Ord. 106-77. Passed 12-7-77; Ord. 48-2019. Passed 5-20-19.)
The City reserves the right to grant such permits as it may deem necessary for allowing persons to connect to the public sewers or drains, provided, however, that the permit shall be granted on the express condition that the owner for whose benefit such connection is made shall, in consideration of the privilege thereby granted, hold the City harmless for any loss or damage that may in any way result or be occasioned by such connection.
(Ord. 106-77. Passed 12-7-77; Ord. 48-2019. Passed 5-20-19.)
(a) All applications for permits shall be made in writing by the parties employed to do the work, and shall be accompanied by the signatures of the owners of the premises for whose benefit the application is made, or by their authorized agents or attorneys and shall contain all information requested by the Director.
(b) The Director is hereby authorized and directed to receive applications for and issue sewer connection permits under the provisions of this chapter.
(c) Upon receipt of a connection application, the Director shall consult his records with regard to the sewer or drain desired to be connected with. If such connection can be made, the Director shall give such applicant the location at which the connection is to be made. The Director shall give to the applicant a permit stating that permission is granted to connect with such sewer or drain and also state in such permit the name of the street and the abutting lot number. All permits shall be issued by the Director. Permits for connection to the sewer system shall be issued dependent on the Director's determination that there is or will be capacity available in all downstream sewers, lift stations, force mains, and the sewage treatment plant including capacity for BOD, SS, and phosphorus.
(Ord. 106-77. Passed 12-7-77; Ord. 48-2019. Passed 5-20-19.)
Effective on and after July 1, 2019, there is hereby established a fee of $250 payable to the City for each sewer connection permit for the cost of inspection services. Excessive construction time or contractor caused delays may result in additional charges. The contractor shall be informed at the time of such charges.
(Ord. 75-79. Passed 8-20-79; Ord. 48-2019. Passed 5-20-19.)
No permit to connect, either directly or indirectly, into a sanitary sewer of the City shall be issued by any official of the City, to any person if the lot or lots or lands to be connected with such sanitary sewer are in whole or in part outside of the sanitary sewer district service area, but the Director may issue such permits even though the lots or lands so to be connected are outside of the territorial limits of the City, if they are wholly within such service area.
(Ord. 106-77. Passed 12-7-77; Ord. 48-2019. Passed 5-20-19.)
(a) There shall be paid to the City a sanitary sewer connection charge for each
connection of a new building, addition or alteration to buildings causing increased sewage
discharge, such amounts and under such circumstances, as hereinafter set forth.
The City of Sylvania connection Fee of $2.50 per gallon per day will be assessed based on Ohio Administrative Code 3745-42-05 in the following manner:
PLACE | SEWAGE FLOW, GALLONS PER DAY |
Single Family Residence | 400 per unit |
Apartments and Condominiums | 120 per bedroom |
Assembly/Banquet Halls | 5 per seat |
Barber Shop | 80 per basin |
Beauty Shop | 200 per basin |
Bowling Alleys (No food service) | 75 per lane |
Car Wash | Contact City |
Churches (no kitchen) | 4 per sanctuary seat |
Churches (large, w/kitchen) | 6 per sanctuary seat |
Convenience Store | 15 per employee |
Country Clubs | 50 per individual (occupancy limit) |
Doctors/Dentists | 75 per doctor 35 per employee 10 per patient (seen daily) |
Industrial Facility | 30 per employee |
Food Service Operations- Restaurant/Tavern (non 24 hr) 24 - hour Restaurant Restaurant along Freeway Curb Service (Drive-In) | 35 per seat 60 per seat 100 per seat 40 per car space |
Gas Station | 500 per pump island |
Hospitals (No resident personnel) | 300 per bed |
Hotels/Motels | 100 per unit |
Institutions (residents) | 100 per bed 35 per employee |
Laundries (coin-operated) | 400 per machine (standard size) |
Mobile Home Parks | 300 per space |
Nursing and Rest Homes | 200 per bed 50 per employee |
Office Buildings | 20 per employee |
PLACE | SEWAGE FLOW, GALLONS PER DAY |
Schools Elementary High and Junior High | 15 per employee 15 per pupil 20 per pupil |
Service Stations | 500 per service bay |
Service Stations w/Store | 20 per employee |
Shopping Centers/Retail | 15 per employee 3 per parking space |
Swimming Pool | 10 per swimmer |
Theater | 5 per seat |
Youth and Recreation Camps | 50 per employee and camper |
Veterinarian/Animal Hospital | 100 per doctor 15 per employee 20 per run and cage |
Note: There shall be a minimum Connection Fee of $1,000.00 for all commercial and/or industrial facilities
(b) There shall be paid to the City, as a sanitary sewer connection charge, for each connection of a main building in areas abutting the wastewater treatment works grant No. C-390691-03 Step 3 project (Phase II Sanitary Sewer Project), such amounts and under such circumstances, as hereinafter set forth, as follows:
(1) For inside City connection, the land being served by which has not been assessed by Phase II sanitary sewers, twenty-five dollars and ninety-four cents ($25.94) per front foot of the land on which such main building is located.
(2) For outside City connections, sixty-eight dollars and twenty-five cents ($68.25) per front foot of the land on which such main building is located.
(c) The connection charges set forth in subsection (a) and (b) hereof are exclusive of, and in addition to, the permit fee established by Section 929.08.
(d) All connection charges received pursuant to this section shall be deposited in the Sewer Revenue Fund.
(e) The Charges for connections outside the City for any real estate included in a territory sought to be annexed to the City by a petition on file in the office of the Clerk-Auditor, when such petition is not being delayed or opposed by any of the owners of real estate in the territory, shall be as specified above for inside City connections.
(f) The above connection charges are effective on and after July 1, 2019.
(Ord. 74-80. Passed 10-20-80; Ord. 48-2019. Passed 5-20-19.)
CONNECTION PROCEDURE
Loading...