1048.01 Purpose.
1048.02 Designation of stormwater authority; powers and duties.
1048.03 Definitions.
1048.04 Determination of need for on-site detention or retention facilities.
1048.05 Determination of need for a stormwater retaining system.
1048.06 Procedure for development of facilities.
1048.07 Design standards.
1048.08 Contents of post-construction stormwater management plan.
1048.09 Standards for post construction stormwater management plan (stormwater plan) approval.
1048.10 Stormwater management plan and BMP construction plans submission.
1048.11 Exemptions.
1048.12 Liability.
1048.13 Review procedures.
1048.14 Review fees.
1048.15 Revision of plan.
1048.16 Drains under the jurisdiction of the Drain Commissioner.
1048.17 As-built certification.
1048.18 Notice of construction commencement.
1048.19 Construction inspections by the City or its representatives.
1048.20 Maintenance agreement.
1048.21 Maintenance inspections.
1048.22 Stormwater management easements.
1048.23 Severability.
1048.24 Stop-work order.
1048.25 Sanctions for violations.
1048.26 Failure to comply: completion.
1048.27 Emergency measures.
1048.28 Cost recovery for damage to storm drain system.
1048.29 Collection of costs; lien.
1048.30 Effect of approval on remedies.
CROSS REFERENCES
Sewers and sewer systems generally - see Mich. Const., Art. 7, Sec. 24; CHTR. Art. 13; M.C.L.A. Secs 46.171 et seq., 67.34, 123.241 et seq., 323.151 et seq., 325.201 et seq.; S.U. & P.S. Ch. 1040
Mortgage bonds for public utilities - see CHTR. Sec. 115
Public utilities - see CHTR. Art. 9
Sewers and sewer systems in home rule cities - see M.C.L.A. Secs. 117.4b, 117.4e, 117.4f, 117.35
Sewer connections in streets - see S.U. & P.S. 1020.09
Utility installations - see S.U. & P.S. 1020.14
Downriver Sewage Disposal System - see S.U. & P.S. Ch. 1042
Flood plain management - see B. & H. Ch. 1464
Soil erosion and sedimentation control - see B. & H. Ch. 1476