1048.10 STORMWATER MANAGEMENT PLAN AND BMP CONSTRUCTION PLANS SUBMISSION
   (a)   The stormwater management plan (stormwater plan) and the associated, proposed BMP construction plans and specifications shall be submitted for review in accordance with the site plan submittal requirements.
   (b)   The BMP construction plans and specifications shall be prepared in accordance with the requirements of this chapter and the current Wayne County Stormwater Management Program Standards (design manual).
   (c)   The BMP construction plans and specifications shall be prepared, signed, and sealed by a licensed professional engineer in the State of Michigan, who shall certify that the design of all stormwater BMPs meets the requirements of this chapter.
   (d)   No changes shall be made to an approved stormwater plan without review and written approval by the City Engineer. A plan amendment may be necessary for a complete review of the stormwater plan and BMP construction plans. Specifications are required to ensure changes to the plan will comply with the requirements of this chapter.
   (e)   Compliance with the requirements of this chapter does not eliminate the need for the proprietor to obtain required permits and approvals from County and State agencies.
   (f)   For site condominiums, complete master deed documents (including "exhibits" drawings) must be submitted for the City's review prior to approval.
(Ord. 22-1028. Passed 10-19-22.)