§ 51.010  ESTABLISHING FEES.
   The following fees are hereby established to recover direct expenses of the utility department.
      (1)   Water department charges for smith taps.
         A.   These rates to be effective January 1, 2013.
 
Size
Price
4 × 4
$1,398.98
6 × 4
$1,440.73
6 × 6
$1,687.02
8 × 4
$1,478.68
8 × 6
$1750.27
8 × 8
$2,239.93
10 × 4
$1,535.60
10 × 6
$1,781.90
10 × 8
$2,265.23
10 × 10
$2,995.06
12 × 4
$1,423.02
12 × 6
$1,707.26
12 × 8
$2,193.13
12 × 10
$2,814.16
12 × 12
$3,917.13
16 × 6
$1,726.24
16 × 8
$2,196.92
16 × 10
$2,903.98
16 × 12
$4,010.74
20 × 6
$1,742.68
20 × 8
$2,253.85
20 × 10
$2,979.88
20 × 12
$4,049.95
24 × 6
$1,816.05
24 × 8
$2,317.10
24 × 10
$3,055.78
24 × 12
$4,180.25
30 × 12
$4,199.22
 
         B.   These rates to be effective January 1, 2014.
 
Size
Price
4 × 4
$1,504.87
6 × 4
$1,550.79
6 × 6
$1,821.70
8 × 4
$1,592.53
8 × 6
$1,891.28
8 × 8
$2,429.90
10 × 4
$1,655.15
10 × 6
$1,926.07
10 × 8
$2,457.73
10 × 10
$3,260.55
12 × 4
$1,531.31
12 × 6
$1,843.97
12 × 8
$2,378.42
12 × 10
$3,061.57
12 × 12
$4,274.83
16 × 6
$1,864.84
16 × 8
$2,382.59
16 × 10
$3,160.36
16 × 12
$4,113.14
20 × 6
$1,882.93
20 × 8
$2,445.21
20 × 10
$3,243.85
20 × 12
$4,420.93
24 × 6
$1,963.64
24 × 8
$2,514.79
24 × 10
$3,327.34
24 × 12
$4,564.26
30 × 12
$4,585.13
 
      (2)   Water reclamation charges for sewer taps.
 
Effective Dates
Size
Cost
January 1, 2015
January 1, 2016
4 inch
$149.75
$400
$420
6 inch
$153.52
$425
$450
 
      (3)   Water department water service connection and meter charges.
 
DIP Main
PVC Main
Service Size (inches)
Copper Service
PEXa Service
Copper Service
PEXa Service
1
$640.31
$536.65
$702.94
$536.65
1-1/4
$1,208.22
$787.46
$1,208.22
$787.46
1-1/2
$1,454.98
$888.78
$1,454.98
$888.78
2
$2,156.76
$1,218.87
$2,156.76
$1,218.87
 
 
Meter Size (inches)
Cost
5/8
$83.25
3/4
$113.75
1
$154.25
1-1/2
$308.50
2
$424.75
3
$1,635.00
4
$2,311.50
6
$4,226.25
 
 
Meter Transmission Unit (MTU)
Cost
4 Port
$195.50
 
      (4)   Water department service charges.
 
Charge
Delinquent bill collection fee
$15
Hydrant flow test
$120
Hydrant meter deposits
Equal to cost of new meter
Hydrant meter set/removal
$29 plus $1/day of use and consumption
Hydrant wheel deposit
$100
Trip charge
$28
Turn-on fee (after hours)
$50
Turn-on fee (new tenant)                             
$10
Turn-on fee (water off for nonpay)
$25
Upsizing meter, plus meter difference
$28
Water meter test (second test in two years)
$25
 
      (5)   Water department account charges.
 
Charge
Account deposit
   Commercial
      Automatic car wash
$300
      Gas station w/car wash
$200
      General
$75
      Laundromats
$250
      Tavern or lounge
$200
   Residential (nonowner)
$80
Bad check charge
$20
 
      (6)   Water and water reclamation charges for laboratory fees.
 
Parameter
Analytical Fee (per sample)
Alkalinity
$15
Ammonia-nitrogen
$25
Anions—ion chromatography (chloride, nitrate, ortho-phosphate, sulfate, bromide, fluoride)
$20
Biochemical oxygen demand (BOD)
$31
Chlorine residual
$25
Color
$30
Conductivity
$15
Fecal coliform
$25
Fluoride electrode
$17
Hardness, calcium
$20
Hardness, total
$20
Metals—AA
   Flame analysis (ppm)
$20
   Furnace (ppb)
$30
   Langlier index
$60
   Magnesium (calculated)
$17
Methane
$30
Nitrite
$25
Oil and grease, total
$50
Oxygen (dissolved)
$20
Ph
$15
Phosphate, total
$30
Residue, total
$25
Residue, volatile
$25
Total dissolved solids
$18
Total Kjeldahl nitrogen, TKN
$40
Total organic carbon
$35
Total suspended solids
$20
Total trihalomethanes
$125
Turbidity
$15
Volatile organic acids
$35
Volatile organics compounds (524.2)
$225
 
      (7)   Light department fees.
 
Charge
Account deposit
   Commercial
$100
   Industrial
60 days estimated charges
   Residential
      Apartment
$80
      House/electric heat
$300
   House/nonelectric heat
$200
Bad check charges
$20
Delinquent bill collection fee
$15
New electric and temporary service
   Polyphase service connection and meter charge
$200
   Primary underground
Customer to install two conduits for the primary wire from road right-of-way to the transformer location and install concrete pad for transformer
   Single-phase service connection and meter charge
$75
   Underground secondary service
Installed and owned by customer
Street light installation
   Arterial street light connection charge, non-city installed
$50
   Arterial streets, per pole
$275
   Residential light connection charge, non-city installed
$35
   Residential, per pole
$225
Street light removal
   Arterial street light disconnection charge, non-city removed
$50
   Arterial streets, per pole
$200
   Residential light disconnection charge, non-city removed
$35
   Residential, per pole
$200
Street lighting assessments/charges
   Commercial zones
Actual costs
   Residential zones, per foot
$3.30
   Wood pole installation
Actual costs
Turn-on (new tenant)
$10
Turn-on fee (after hours)
$50
Turn-on fee (service off for nonpay)
$35
 
(1992 Code, § 41-42)  (Ord. 95-89, passed 9-11-1989; Ord. 106-95, passed 8-7-1995; Ord. 6-99, passed 1-4-1999; Ord. 27-99, passed 3-15-1999; Ord. 43-01, passed 5-14-2001; Ord. 105-06, passed 8-21-2006; Ord. 98-07, passed 6-18-2007; Ord. 99-07, passed 6-18-2007; Ord. 56-10, passed 6-21-2010; Ord. 47-11, passed 6-20-2011; Ord. 52-12, passed 7-10-2012; Ord. 35-14, passed 6-17-2014; Ord. 31-18, passed 4-17-2018; Ord. 59-19, passed 5-21-2019)