Skip to code content (skip section selection)
Compare to:
Signal Hill Overview
Signal Hill Municipal Code
Chapter 15.28
METAL BUILDINGS
Sections:
   15.28.010   Definitions.
   15.28.020   Site plan and design review of metal buildings.
   15.28.030   Design review standards.
   15.28.040   Design requirements.
15.28.010   Definitions.
   For the purpose of this chapter, the following definitions shall apply:
   A.   Alteration or Enlargement. A metal building is altered or enlarged if it is remodeled or added to or repaired and the cost of such work exceeds fifty percent of the value of the building before such work, as determined by the design review board.
   B.   "Metal building" means any building having an exposed sheet metal covering on the weather side of any portion of the roof or the outside surface of any exterior wall.
   C.   "Sheet metal" includes, but is not limited to, all types of preformed metal sheets such as corrugated iron, steel, and aluminum.
(Ord. 74-3-721 § 1 (part): prior code §§ 14.32.010, 14.32.060)
15.28.020   Site plan and design review of metal buildings.
   No person shall construct, alter or enlarge any metal building and no permit shall be issued for such construction until the site plan and design has been submitted to, reviewed by and approved in accordance with the provisions of Chapter 20.52, Site Plan and Design Review.
(Ord. 90-01-1052 § 7 (part): Ord. 74-3-721 § 1 (part): prior code § 14.32.020)
Loading...