17.44.030: ADDITIONAL SURVEYS OR INSPECTIONS; FEE:
In the event that the director finds the sewer connection at the building is not exposed when the inspector or surveyor visits the site to determine the materials used and/or elevation, or if the permittee has not given sufficient information when making application for a permit so that the survey can be completed, or if the permittee requests a change in the survey, an additional fee, as shown on the Salt Lake City consolidated fee schedule, shall be charged by the POTW. (Ord. 46-16, 2016)