17.32.580: SIGNIFICANT NONCOMPLIANCE (SNC):
"Significant noncompliance (SNC)" shall be applicable to all significant industrial users (or any other industrial user that violates subsection C, D or H of this section) and shall mean:
   A.   "Chronic violations of wastewater discharge limits", defined here as those in which sixty six percent (66%) or more of all the measurements taken for the same pollutant parameter taken during a six (6) month period exceed (by any magnitude) a numeric pretreatment standard or requirement, including instantaneous limits as defined herein;
   B.   "Technical review criteria (TRC) violations", defined here as those in which thirty three percent (33%) or more of wastewater measurements taken for the same pollutant parameter during a six (6) month period equals or exceeds the product of the numeric pretreatment standard or requirement including instantaneous limits, as defined herein, multiplied by the applicable TRC (TRC equals 1.4 for BOD, TSS, fats, oils and grease, and TRC equals 1.2 for all other pollutants except pH);
   C.   Any other violation of a pretreatment standard or requirement as defined herein (daily maximum, long term average, instantaneous limit, or narrative standard) that the director determines has caused, alone or in combination with other discharges, interference or pass-through, including endangering the health of POTW personnel or the general public;
   D.   Any discharge of a pollutant that has caused imminent endangerment to the public or to the environment, or has resulted in the director's exercise of emergency authority to halt or prevent such a discharge;
   E.   Failure to meet, within ninety (90) days of the scheduled date, a compliance schedule milestone contained in a wastewater discharge permit or enforcement order for starting construction, completing construction, or attaining final compliance;
   F.   Failure to provide within forty five (45) days after the due date, any required reports, including baseline monitoring reports, reports on compliance with categorical pretreatment standard deadlines, periodic self-monitoring reports, and reports on compliance with compliance schedules;
   G.   Failure to accurately report noncompliance; or
   H.   Any other violation(s), which may include a violation of best management practices, which the director determines will adversely affect the operation or implementation of the local pretreatment program. (Ord. 68-11, 2011)