17.16.345: LOT HYDRANT; FEE:
When a culinary water service meter is not used for construction purposes, then during any lot or subdivision construction in the city's service area, the contractor shall install for each lot a hose bib (standpipe with automatic drain) meeting the requirements of the city's director of public utilities. A flat fee, as shown on the Salt Lake City consolidated fee schedule, for water used during construction per residential lot shall be charged to and paid by the contractor. Commercial properties shall pay metered rates. (Ord. 24-11, 2011)