14.32.410: PUBLIC WAY OBSTRUCTION FEES:
In addition to excavation or improvement fees described in section 14.32.400 and section 14.32.405, the city engineer shall charge, and the city shall collect, upon issuing a permit, the fees shown on the Salt Lake City consolidated fee schedule for obstructions in the public way:
   A.   If the permit is for an obstruction that will be in place for more than twenty eight (28) calendar days, a monthly fee for all or any part of a block face for such activities as barricading for sidewalk closures, lane closures, sidewalk canopies, containers in the public way, or storage of construction materials or equipment.
   B.   If the permit is for an obstruction that will be in place for twenty eight (28) or fewer calendar days, a weekly fee for all or any part of a block face for such activities as barricading for sidewalk closures, lane closures, sidewalk canopies, containers in the public way, or storage of construction materials or equipment.
   C.   On a permit that lasts seven or fewer calendar days, an obstruction fee is waived if an excavation fee or an improvement fee is charged.
   D.   When the duration of the obstruction permit doesn't end at the end of a week or month, the fee will be determined by rounding to the nearest whole week with the intent to simplify the fee determination. For example, an obstruction permit that is to cover a period of six and one-half (6-1/2) months could be charged a fee for six (6) times the monthly fee and two (2) times the weekly fee. (Ord. 30-21, 2021: Ord. 24-11, 2011)