CHAPTER 1066
Storm Sewer Connections and Regulations
EDITOR'S NOTE: Ordinance 94-45, passed July 5, 1994, adopted a Stormwater Management Plan. Copies of this ordinance and of the Plan may be obtained, at cost, from the Manager.
   Resolution 97-30R, passed August 5, 1997, adopted the Storm Sewer Master Plan for the Olde Pickerington Area, prepared by Dodson-Stilson, Inc., for the City. Copies of this resolution and of the Plan may be obtained, at cost, from the Manager.
1066.01   Control of storm water runoff.
1066.02   Permit required; fee.
1066.03   Discharges permitted and prohibited.
1066.04   Construction plans required.
1066.05   Construction and material specifications.
1066.06   Engineering inspection required.
1066.07   Municipality’s rights.
1066.08   Rules and regulations; removal of unlawful connections.
1066.99   Penalty.
   CROSS REFERENCES
   Sewer user regulations - see S.U. & P.S. Ch. 1054
   Sanitary sewer connections - see S.U. & P.S. Ch. 1056
   Sewer system capacity charges - see S.U. & P.S. Ch. 1058
   Sewer service rates - see S.U. & P.S. Ch. 1060
   Industrial user sewer rates - see S.U. & P.S. Ch. 1062
   Sewer installers - see S.U. & P.S. Ch. 1064
   Stormwater utility charges - see S.U. & P.S. Ch. 1067
   Sanitary sewer improvements - see P. & Z. 1258.21