A re-inspection fee shall be paid prior to the re-inspection of an underground storage tank in the following instances:
(A) If the USTP is denied for failure to pay appropriate fees;
(B) If the underground storage tank fails to comply with requirements set forth in this Code or by state law; or
(C) If an inspection or re-inspection is cancelled by the owner or operator of the facility or tank to be inspected less than 24 hours prior to the scheduled inspection.
(Ord. No. 2775)
An underground storage tank or its components shall not be installed, repaired, replaced, modified, or closed unless an installation, repair, replacement, modification, or closure permit is issued to the owner or operator of the underground storage tank.
(Ord. No. 2775)