Loading...
No change shall be made to a building, open lot or portion thereof inconsistent with the last issued certificate of occupancy or, where applicable, inconsistent with the last issued certificate of completion for such building or open lot or which would bring it under some special provision of this code or other applicable laws or rules, unless and until the commissioner has issued a new or amended certificate of occupancy.
When changes are made in the address of a building or open use, the block and/or lot numbers, or the metes and bounds of the zoning lot that are inconsistent with that indicated on a certificate of occupancy, the owner shall obtain a new or amended certificate of occupancy within one year of such change. For purposes of this section:
1. The date of change in the metes and bounds of the zoning lot shall be the date of the approval of construction documents for any new building or enlargement on the zoning lot, as per article 104 following the reporting required in section 28-104.7.18;
2. The date of the change of the address or the block and/or lot numbers shall be the date such change is made effective by the borough president or the department of finance.
(Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
Where metes and bounds of the zoning lot have been changed after the effective date of the local law that added this section and construction documents are approved for a new building or enlargement within such metes and bounds, an owner of a tax lot within such metes and bounds with a certificate of occupancy that does not indicate zoning lot metes and bounds shall file an application with the department notifying it of the amended metes and bounds, including the city registration file number (CRFN) numbers of the related zoning lot exhibits, and obtain approval and sign off within one year from the date of such change in metes and bounds. For purposes of this section, the date of change in the metes and bounds of the zoning lot shall be the date of the approval of construction documents for any new building or enlargement on the zoning lot, in accordance with article 104 following the reporting required in section 28-104.7.18.
(L.L. 2021/126, 11/7/2021, eff. 11/7/2022)
Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.
Loading...