The permit holder shall maintain a copy of the construction permit and approved plans at the construction site, which shall be displayed and made available for inspection by the Village Administrator at all times when construction work is occurring.
(Ord. 106-01-99. Passed 1-26-99.)
If the construction permit specifies the location of facilities by depth, line, grade, proximity to other facilities or other standard, the permit holder shall cause the location of such facilities to be verified by a registered Ohio land surveyor. The permit holder shall relocate any facilities that are not located in compliance with permit requirements.
(Ord. 106-01-99. Passed 1-26-99.)
The permit holder shall promptly complete all construction activities so as to minimize disruption of the public ways and other public and private property. All work authorized by a construction permit within public ways, including restoration as required under this legislation, must be completed within one hundred eighty (180) days of the date of issuance of the construction permit, or such longer period authorized by the Village.
(Ord. 106-01-99. Passed 1-26-99.)
Loading...