(a) Receptacles required. Loose debris, paper, building material waste, scrap material and other trash produced by those working on the construction or demolition site shall be contained. The number of containers required at the work site and the frequency of disposal shall be determined by the volume of refuse produced.
(b) Adjacent areas. Dirt, sand, construction materials or other debris cast or scattered upon any adjacent public or private property as a result of construction or demolition activities shall be removed by the construction or demolition site contractor not later than the end of the work day of the incident or earlier if the materials shall cause a public nuisance.
(Ord. 86-9, passed 5-13-86)