941.10 EXTENSION OF WATER SUPPLY LINES.
   (a)    Before any extensions may be made to the City water mains, three copies of a drawing or blueprint made to scale of the proposed extension shall be submitted to the Bureau of Buildings, Inspections, Licenses and Permits for approval. The proposed extension, if not governed by subdivision regulations, must then be authorized by Council. If the plan is authorized, the water line must be installed under the supervision of the Engineering Department, all in accordance with standard City specifications. Upon completion of the extension, the owner shall file with the Engineering Department a set of "as built" plans complete with proper measurements and markings of all valves and size of mains and other such measurements as may be required.
   (b)    No plumber or other person shall undertake or cause to be undertaken any extensions or alterations for conducting water in or into any premises without first obtaining a written permit from the Bureau of Buildings, Inspections, Licenses and Permits. The applicant must accompany the request for a permit with a complete report in writing of the uses for which the water is to be supplied. A report must be made within forty-eight hours after the completion of the work and no stopcock shall be left open or water turned on unless the permit so states.
(Ord. 96-079. Passed 5-7-96.)