Skip to code content (skip section selection)
Compare to:
CHAPTER 1339
Storm Water Management
1339.01   Purpose and scope.
1339.02   Definitions.
1339.03   Disclaimer of liability.
1339.04   Conflicts, severability, nuisances and responsibility.
1339.05   Consultations.
1339.06   Compliance with other rules and regulations.
1339.07   Issuance of building permits.
1339.08   Application procedures for Storm Water Management Plans (SWMP) and Abbreviated Storm Water Pollution Prevention Plans (SWP3).
1339.09   Controlling construction site soil erosion, sediment and other wastes and storm water runoff.
1339.10   Construction minimum standards.
1339.11   Controlling post-construction water quality runoff.
1339.12   Maintenance.
1339.13   Easements.
1339.14   Construction and maintenance guarantee.
1339.15    (Reserved).
1339.16   Hydrologic and hydraulic study and report.
1339.17   Final completion.
1339.99   Penalties.
CROSS REFERENCES
Illicit discharge and illegal connection control - see S.U. & P.S. Ch. 917