Any person who desires to occupy or obstruct any part of any sidewalk or street during the excavation of any building, or for the storage of material for the construction, repair or removal of any buildings, may, after having procured the permits required by the provisions of this code, occupy and obstruct for such purposes not more than one-third (1/3) of the width of such street, including the sidewalk on the conditions hereinafter set forth. (Ord. 621, 12-17-1906)
Such person shall construct and maintain, during the progress of such work, a good and sufficient fence, from sidewalk to sidewalk, enclosing such excavation; provided, that a driveway may be left in such fence during the actual delivery of material into or from such excavation, such driveway to be safely closed, except when in actual use. Such person shall furthermore construct and maintain a sidewalk free from obstructions, from the permanent sidewalk to sidewalk, not less than three feet (3') in width and composed of plank not less than two inches (2") in thickness around such excavation, or such materials or fence. (Ord. 621, 12-17-1906)
The portion of the sidewalk or street so to be used shall be only that portion directly in front of the property to be improved, and no material shall be stored upon the street, except such as is to be immediately used in such improvement or construction; and no rubbish removed from the excavation of a building shall be allowed to be stored upon the street, but the same must be removed from day to day. (Ord. 621, 12-17-1906)
Loading...