A water system capacity charge shall be made for each new service branch to any property and shall be paid at the time that the application for the connection permit is made for the service. This charge shall be in addition to any other fees or charges made for water connections and shall be payable to the Village.
(a) Prohibition. No person, firm or corporation shall install a service branch, or any part thereof, to the water system of the Village unless he or they have been issued a permit therefor by the Village.
(b) A water system capacity charge shall be paid to the Village whenever an application for a connection permit is made for a water service tap to be connected to a water line which is part of or will become a part of the Village’s water system, or which is built by or under the direction and/or supervision of the Village. No water service tap shall be connected to such water lines without a connection permit first being issued by the Village.
Upon proper proof of hardship, the Village Administrator may arrange for a payment schedule for the foregoing capacity charge.
(c) Capacity Charges:
(1) Capacity charges for normal water service shall be as follows:
Tap Size Inside Domestic Inside Fire Outside Domestic Outside Fire 0.75 1471. N/A 2206.50 N/A 1.00 2614. N/A 3921. N/A 1.50 5882. N/A 8823. N/A 2.00 10,462. N/A 15,693. N/A 3.00 11,763.50 11,763.50 17,645.50 17,645.50 4.00 20,913. 20,913. 31,369.50 31,369.50 6.00 47,054.50 47,054.50 70,582. 70,586.00 8.00 83,652.50 83,652.50 125,479. 125,479. 10.00 130,707. 130,707. 196,060.50 196,060.5 12.00 188,314. 188,314. 282,471. 282,471. 16.00 9 273,055.50 273,055.50 409,583.50 409,583.50 |
(2) Any water service tap larger than those set forth herein shall be the subject of a special action by Council prior to issuance of a connection permit.
(3) Water service taps shall not be smaller than the water service line connecting the tap to the property or facility serviced.
(4) Property owners of record as of the effective date of this subsection (c) where water lines are either existing or presently under construction as of the effective date and where there is an existing residence or business as of the effective date shall be allowed to be issued a connection permit at the capacity charges in effect immediately preceding the effective date hereof if application for same is made within sixty days of the effective date hereof. Connection permits issued pursuant to this subsection shall be valid for a period of ninety days from the date of issuance or for a period of ninety days after completion of construction, if applicable, whichever is later.
(5) Except as otherwise provided under subsection (c)(4) hereof, all connection permits issued pursuant to this section shall be valid for a period of ninety days from the date of issuance.
(6) In the event that water usage does not commence within the validity period of any connection permit issued under this section, then an application for a new connection permit must be submitted and an additional water system capacity charge shall be paid, at the time of such application submittal, equal to the greater of:
A. The difference between the charges stipulated in subsections (c)(1) through (c)(5) hereof and the amount previously paid, or
B. Fifty dollars ($50.00).
(7) Water system capacity charges shall be deposited into the Village’s Water Replacement & Improvement Fund.
(Ord. 90-01. Passed 1-16-02.)
A wastewater system capacity charge shall be made for each new wastewater connection to any property and shall be paid at the time that the application for the connection permit is made for the service. This charge shall be in addition to any other fees or charges made for wastewater connections and shall be paid to the Village.
Upon proper proof of hardship, the Village Administrator may arrange for a payment schedule for the foregoing capacity charge.
(a) Prohibition. No person, firm or corporation shall make a wastewater connection or any part thereof to the wastewater system of the Village, unless he or they have been issued a permit therefor by the Village.
(b) Rates. The Fiscal Officer is hereby authorized and directed to make a wastewater system capacity charge whenever an application is made for sanitary sewage collection service from a structure or units whenever such property is or may be serviced by a wastewater connection line connected to a tributary directly or indirectly to any public wastewater system built by or under the supervision of the Village. These charges shall be according to the size of the water main tap that supplies water to the structure or units.
(c) Capacity Charges.
(1) Waterwater system capacity charges for wastewater service shall be as follows:
Nominal Water Tap Diameter (inches) Capacity Charge Outside Hebron 3/4 $ 1,449 2174. 1 2,576 3864. 1 ½ 5,797 8696. 2 10,311 15,467. 3 23,188 34,782. 4 41,223 61,850. 6 92,752 139,128. 8 164,892 247,338. 10 257,644 386,466 12 371,196 556,794. 16 538,234 807,351. |
(2) Where all or a determined portion of a water service tap is installed for fire protection, no normal use of wastewater is anticipated and therefore, no wastewater system capacity charge shall be levied on that portion used solely for fire protection.
(3) In the event a water service tap is enlarged, the wastewater system capacity charge difference between the two diameter sizes shall be paid to the Village.
(4) Any wastewater system capacity charge where the water service tap is larger than those set forth herein shall be the subject of a special action by Council prior to issuance of a connection permit.
(5) All wastewater system service connections and lines shall be approved by the Village Administrator.
(6) Property owners of record as of the effective date of this subsection (c) hereof, where wastewater lines are either existing or presently under construction as of such effective date and where there is an existing residence or business as of such effective date shall be allowed to be issued a connection permit at the capacity charges in effect immediately preceding the effective date hereof if application for same is made within sixty days of the effective date hereof. Connection permits issued pursuant to this subsection shall be valid for a period of ninety days from the date of issuance or for a period of ninety days after completion of construction, if applicable, whichever is later.
(7) Except as otherwise provided under subsection (c)(6) hereof, all connection permits issued pursuant to this section shall be valid for a period of ninety days from the date of issuance.
(8) In the event that wastewater usage does not commence within the validity period of any connection permit issued under this section, then an application for a new connection permit must be submitted and an additional wastewater system capacity charge shall be paid, at the time of such application submittal, equal to the greater of:
A. The difference between the charges stipulated in subsections (c)(1) through (c)(4) hereof and the amount previously paid, or
B. Fifty dollars ($50.00).
(9) Wastewater system capacity charges shall be deposited into the Village’s Sewer Replacement and Improvement Fund.
(Ord. 89-01. Passed 1-16-02.)
(a) The Village Water and Sewer Clerk is authorized to take the necessary steps to access a twenty five dollar ($25.00) fee when an account is placed on the turn-off list.
(b) The Village Water and Sewer Clerk is hereby authorized to accept only full payments for water/sewer accounts, unless written authorization is presented from the Village Administrator instructing her to do otherwise.
(Ord. 31-01. Passed 6-6-01.)