Section
General Provisions
50.001 Administration
50.002 Application for service
50.003 Meter required; meters to be read monthly; estimated charge and adjustments for leaks
50.004 Service and tap connection charges
50.005 Water rates and accounts
Cross-Connection Control and Prevention
50.015 Cross-connection standards
50.016 Definitions
50.017 Right-of-way encroachment
50.018 Multiple connections
50.019 Protection required; installation
50.020 Testing of assemblies
50.021 Thermal expansion
50.022 Pressure loss
50.023 Residential service connections
50.024 Rental properties
50.025 Customer service inspection
50.026 Installation guidelines and requirements for backflow prevention assemblies
50.027 Air gap separation
50.028 Fire systems
50.029 Responsibilities
50.030 Backflow prevention assembly tester certification; registration required
50.031 Fees
50.032 Compliance for lawn irrigation
50.033 Compliance for mobile units
50.034 Violations
General Policies and Regulations Regarding Water and Wastewater
50.045 Control of and access to systems; interference with access generally
50.046 Emergency authority
50.047 City supply must be adequate
50.048 Temporary discontinuance for construction, maintenance or emergency reasons
50.049 Authorized employees; right of access of employees for inspection and maintenance; access of contractors
50.050 Service connections
50.051 Construction and installation rules
50.052 Nuisance
50.053 Cross-connections; location of water and sewer mains
50.054 Fire protection systems
50.055 Fire hydrants
50.056 Private water mains or systems
50.057 Wastewater indemnity agreements
50.058 Exposing meters or hydrants to damage; notice of work affecting systems; moving meters or hydrants
50.059 Water used for construction work
50.060 Liability for damages
50.061 Tampering with or damaging systems; unlawful use of water; prima facie evidence
Sewer Rates and Charges; Billing
50.105 Definitions
50.106 Provisions control
50.107 Charges levied
50.108 Customer classification
50.109 Monthly charge
50.110 Surcharge schedule
50.111 Unusual discharges; user responsible for expenses
50.112 Billing
50.113 Wastewater and water service; contract for service
50.114 Charges payable with water bills
50.115 Failure to pay; disconnection
50.116 Charges sufficient to maintain system
50.117 No free service
50.118 Remedies not exclusive
Drought Contingency Plan
50.130 Declaration of policy, purpose, and intent
50.131 Public involvement
50.132 Public education
50.133 Coordination with regional water planning groups
50.134 Authorization
50.135 Application
50.136 Definitions
50.137 Triggering criteria for initiation and termination of drought response stages
50.138 Drought response stages
50.139 Enforcement
50.140 Variances
50.999 Penalty