(a) The City Engineer, or authorized representative, may enter permitted sites at reasonable times as deemed necessary to make regular on-site inspections to ensure the validity of self-inspection reports. Such inspections may take place before, during and after any earth change activity for which a permit has been issued.
(b) If the inspection reveals that a control practice is in need of repair or maintenance, it must be repaired or maintained by the date specified by the City Engineer.
(c) If the inspection reveals that a control practice fails to perform its intended function and that another, more appropriate control practice is required, the SWP3 must be modified in accordance with the provisions of this chapter and the new control practice must be installed by the date specified by the City Engineer.
(d) If the inspection reveals that a control practice has not been implemented in accordance with the schedule contained in the SWP3, the control practice must be implemented by the date specified by the City Engineer. If the inspection reveals that the planned control practice is not needed, the permittee must submit to the City Engineer a statement of explanation as to why the control practice is not needed within ten days from the date of the inspection.
(Ord. 2008-18. Passed 2-19-08.)