Skip to code content (skip section selection)
Compare to:
Elyria Overview
Elyria, OH Code of Ordinances
CODIFIED ORDINANCES OF THE CITY OF ELYRIA, OHIO
DIRECTORY OF OFFICIALS (2024)
PRELIMINARY UNIT
CHARTER OF THE CITY OF ELYRIA, OHIO
PART ONE - ADMINISTRATIVE CODE
PART THREE - TRAFFIC CODE
PART FIVE - GENERAL OFFENSES CODE
PART SEVEN - BUSINESS REGULATION CODE
PART NINE - STREETS AND PUBLIC SERVICES CODE
TITLE ONE - Street and Sidewalk Areas
TITLE THREE - Public Utilities
TITLE FIVE - Other Public Services
CHAPTER 951 City Cemeteries
CHAPTER 955 Parks
CHAPTER 959 Sanitation Department Rules and Regulations
CHAPTER 960 Storm Water Management
960.01 DEFINITIONS.
960.02 PURPOSE AND INTENT.
960.03 APPLICABILITY.
960.04 ADMINISTRATION.
960.05 DISCLAIMER OF LIABILITY.
960.06 ENVIRONMENTAL LAWS.
960.07 SEVERABILITY.
960.08 CONFLICTING INFORMATION.
960.09 PROPERTY RIGHTS.
960.10 RESPONSIBILITY.
960.11 DUTY TO MITIGATE.
960.12 INFORMATION.
960.13 WATERCOURSE PROTECTION.
960.14 PROHIBITION OF ILLICIT DISCHARGES.
960.15 PROHIBITION OF ILLEGAL CONNECTIONS.
960.16 CONTROL OF MATERIALS AND DEBRIS.
960.17 NOTIFICATION OF SPILLS.
960.18 STORM WATER PERMITS.
960.19 SIGNATORY REQUIREMENTS.
960.20 STORM WATER PERMIT COVERAGE.
960.21 STORM WATER PERMIT TRANSFER.
960.22 STORM WATER PERMIT MODIFICATION.
960.23 STORM WATER PERMIT TERMINATION.
960.24 STORM WATER POLLUTION PREVENTION PLAN (SWP3).
960.25 CONTROL PRACTICE MAINTENANCE.
960.26 SELF-INSPECTION OF CONTROL PRACTICES DURING CONSTRUCTION.
960.27 CITY INSPECTION OF CONTROL PRACTICES DURING CONSTRUCTION.
960.28 POST-CONSTRUCTION INSPECTION AND MAINTENANCE AGREEMENTS.
960.29 DEED OR FINAL PLAT REQUIREMENTS.
960.30 PERMANENT EASEMENTS.
960.31 REVIEW AND PERMITTING FEES.
960.32 ACCESS AND INSPECTION.
960.33 ENFORCEMENT.
960.34 APPEAL OF NOTICE OF VIOLATION.
960.35 ENFORCEMENT MEASURES AFTER APPEAL.
960.36 STOP WORK ORDERS.
960.37 INJUNCTIVE RELIEF.
960.38 VIOLATIONS DEEMED A PUBLIC NUISANCE.
960.39 MINOR MISDEMEANOR.
960.40 FEE RECOVERY.
960.41 REMEDIES NOT EXCLUSIVE.
960.42 CREATION OF A STORM WATER UTILITY PROGRAM.
960.43 FUNDING THE STORM WATER UTILITY PROGRAM.
960.44 STORM WATER UTILITY PROGRAM ENTERPRISE FUND.
960.45 STORM WATER UTILITY OPERATING BUDGET.
960.46 RATE STRUCTURE CHARGES AND FEES.
960.47 NECESSITY FOR CHARGES.
960.48 POWERS OF THE SAFETY-SERVICE DIRECTOR.
960.49 RIGHT TO APPEAL BY NONRESIDENTIAL PROPERTY OWNER.
960.50 COLLECTION.
960.51 ADJUSTMENTS TO STORM WATER SERVICE CHARGES.
960.52 PAYMENT OF CHARGES.
960.53 FALSIFYING INFORMATION.
PART ELEVEN - PLANNING AND ZONING CODE
PART THIRTEEN - BUILDING CODE
PART FIFTEEN - FIRE PREVENTION CODE
Loading...
960.26 SELF-INSPECTION OF CONTROL PRACTICES DURING CONSTRUCTION.
   (a)   Inspections of all control measures shall be in accordance with the approved SWP3.
   (b)   The permittee shall assign qualified inspection personnel to conduct inspections.
   (c)   The purpose of such inspections will be to ensure that the control practices are functional, evaluate whether the SWP3 is adequate and properly implemented in accordance with the schedule proposed, determine the overall effectiveness of the plan and determine the need for additional control measures.
      (1)   Disturbed areas and areas used for storage of materials that are exposed to precipitation shall be inspected for evidence of or the potential for pollutants entering the storm water drainage system.
      (2)   Discharge locations shall be inspected to ascertain whether erosion and sediment control measures are effective in preventing significant impacts to the receiving waters.
      (3)   Locations where vehicles enter or exit the site shall be inspected for evidence of off-site vehicle tracking.
   (d)   All inspections shall be documented in written form and submitted to the City Engineer at the time interval specified in the approved permit. Submissions shall include the following information:
      (1)   Names and qualifications of personnel making the inspection;
      (2)   The date and location of the inspection;
      (3)   Whether construction is in compliance with the approved storm water management plan;
      (4)   Variations from the approved construction specifications;
      (5)   Any violations that exist; and
      (6)   Steps taken to correct such violations and the date these corrective actions were taken.
   (e)   The permittee shall maintain for three years following permit termination approval, a record summarizing the results of the inspections.
(Ord. 2008-18. Passed 2-19-08.)
960.27 CITY INSPECTION OF CONTROL PRACTICES DURING CONSTRUCTION.
   (a)   The City Engineer, or authorized representative, may enter permitted sites at reasonable times as deemed necessary to make regular on-site inspections to ensure the validity of self-inspection reports. Such inspections may take place before, during and after any earth change activity for which a permit has been issued.
   (b)   If the inspection reveals that a control practice is in need of repair or maintenance, it must be repaired or maintained by the date specified by the City Engineer.
   (c)   If the inspection reveals that a control practice fails to perform its intended function and that another, more appropriate control practice is required, the SWP3 must be modified in accordance with the provisions of this chapter and the new control practice must be installed by the date specified by the City Engineer.
   (d)   If the inspection reveals that a control practice has not been implemented in accordance with the schedule contained in the SWP3, the control practice must be implemented by the date specified by the City Engineer. If the inspection reveals that the planned control practice is not needed, the permittee must submit to the City Engineer a statement of explanation as to why the control practice is not needed within ten days from the date of the inspection.
(Ord. 2008-18. Passed 2-19-08.)
960.28 POST-CONSTRUCTION INSPECTION AND MAINTENANCE AGREEMENTS.
   (a)   All post-construction, or permanent, storm water facilities installed since April 21, 2003,shall have signed inspection and maintenance agreements with the City to ensure the system continues to function as designed.
   (b)   The City may, at any time in writing, require a time frame in which to address any maintenance needs of a storm water management control practice and/or an increase to inspection and maintenance requirements.
   (c)   Parties responsible for the inspection and maintenance of storm water management facilities shall make records available to the City during inspections and at other reasonable times upon request.
(Ord. 2008-18. Passed 2-19-08; Ord. 2012-105. Passed 9-4-12.)
Loading...