(a) Written notification requesting permit termination shall be submitted to the City Engineer upon final stabilization of the site. Notifications shall be accompanied by a copy of the legally binding inspection and maintenance agreement for permanent storm water management facilities, including deed and final plat requirements and as-built data, in accordance with the provisions of this chapter.
(b) The permit terminates upon acceptance, in writing, of the permit termination request, by the City Engineer.
(Ord. 2008-18. Passed 2-19-08; Ord. 2012-105. Passed 9-4-12.)
(a) SWP3 plans shall be prepared in accordance with sound engineering and/or conservation practices and stamped by an Engineer. The following shall be included as part of the SWP3:
(1) A signed statement noting that the permittee will inspect and approve the control measures completed in accordance with the SWP3.
(2) A signed statement by the permittee that any clearing, grading, construction, or development, or all of these, will be done pursuant to the SWP3.
(3) Permanent easements, in accordance with the provisions of this chapter.
(4) Procedures in the SWP3 shall provide that all controls on the site are inspected at least once every seven calendar days and within twenty-four hours after any storm event greater than one-half inch of rain per twenty-four hour period.
(5) Acceptable control practices for storm water management.
A. Control practices for construction and post-construction storm water management, including erosion and sediment controls, shall meet or exceed the minimum current standards established by the Ohio EPA.
B. Where the City Engineer deems appropriate, more stringent control measures may be requested.
C. Where runoff from a new development or redevelopment area is planned to discharge into an existing storm water drainage system, an analysis shall be prepared to verify that the existing storm water drainage system has the capacity to accommodate the additional peak flow runoff rates.
(b) The City Engineer, or authorized representative, may require any additional information or data.
(c) All SWP3s shall be maintained at the permitted site until permit termination, in accordance with the provisions of this chapter.
(Ord. 2008-18. Passed 2-19-08; Ord. 2012-105. Passed 9-4-12.)
(a) The permittee shall at all times properly operate and maintain all facilities and systems of storm water management and related appurtenances which are installed or used by the permittee to achieve compliance with the conditions of the permit and this chapter.
(b) Proper operation and maintenance requires the operation of backup or auxiliary facilities or similar systems, installed by a permittee when necessary to achieve compliance with the conditions of the permit and this chapter.
(c) All temporary and permanent control practices shall be maintained to meet the design standards and repaired as needed to ensure continued performance of their intended function.
(d) The applicant shall provide a description of inspection and maintenance procedures needed to ensure the continued performance of temporary and permanent storm water control practices as part of the SWP3.
(Ord. 2008-18. Passed 2-19-08; Ord. 2012-105. Passed 9-4-12.)