1. The SWMP shall contain all items required by the SWM Ord. [Chapter 19].
2. The subdivison or land development plan shall contain the following:
A. Staging or implementation schedule for constructing the proposed stormwater control system.
B. Detailed maintenance requirements and schedule to ensure adequate maintenance of stormwater management facilities.
C. Reference to the approved SWMP including:
(1) Title.
(2) Preparer.
(3) Final date or approved plan.
D. All essential grading and structural elements of the plan.
E. If the subdivision or land development is to be developed in stages, a general drainage plan for the entire tract shall be provided with the first stage and appropriate development stages for the drainage system indicated thereon.
(Ord. 2011-05, 3/14/2011, § 1002)