§ 22-1001.   Scope.
   1.   A stormwater management plan (SWMP), prepared in accordance with the Dover Township Stormwater Management Ordinance (SWM Ord.) [Chapter 19] shall be required for each subdivision or land development plan at the preliminary plan submittal stage. As an integral part of the SWMP, erosion and sediment pollution control measures shall be included. A SWMP must be approved prior to the construction of any improvements.
   2.   All SWMPs shall be prepared and certified by the appropriate design professional.
(Ord. 2011-05, 3/14/2011, § 1001)