1. Pre-application Procedures.
A. Prior to the preparation of any plans, it is suggested that prospective developers consult with PADEP concerning soil suitability when on-site sewage disposal facilities are proposed.
B. Prospective developers shall consult the York County Conservation District representative concerning erosion and sediment pollution control and the effect of geologic conditions on the proposed development. At the same time, a determina tion should be made as to whether or not any flood hazards either exist or will be created as a result of the subdivision or development.
2. Preliminary Plan Requirements. The following information shall be required as part of the preliminary plan and shall be prepared by the appropriate responsible professional:
A. Name of engineer, surveyor or other qualified person responsible for providing the information required in this Section.
B. A map showing the location of the proposed subdivision or land develop ment with respect to any designated floodplain area, including information on, but not limited to, the 100-year flood elevations, boundaries of the floodplain areas or floodway areas, proposed lots and sites, fills, flood or erosion protective facilities, and areas subject to special deed restrictions.
C. Where the subdivision or land development lies partially or completely within any designated floodplain area, or where the subdivision or land develop ment borders on a floodplain area, the preliminary plan map shall include detailed information giving the location and elevation of proposed roads, public utilities and building sites. All such maps shall also show contours at intervals of no greater than 5 feet, and shall identify accurately the boundaries of the floodplain areas.
D. Such other information as is required by this Chapter.
3. Final Plan Requirements. The following information shall be required as part of the final plan and shall be prepared by the appropriate design professional:
A. All information required for the submission of the preliminary plan incorporating any changes requested by the Board of Township Supervisors and/or Planning Commission.
B. A map showing the exact location and elevation of all proposed buildings, structures, roads and public utilities to be constructed within any designated floodplain area. All such maps shall show contours at intervals of no greater than 5 feet within the floodplain area, and shall identify accurately the boundaries of the floodprone areas.
C. Submission of the final plan shall also be accompanied by all required permits and related documentation from PADEP, and any other Commonwealth agency, or local municipality where any alteration or relocation of a stream or watercourse is proposed. In addition, documentation shall be submitted indicating that all affected adjacent municipalities have been notified in advance of the proposed alteration or relocation. The Department of Community and Economic Development and the Federal Emergency Management Agency (FEMA) shall also be notified in advance of any such proposed activity, and proof of such notification shall be submitted in advance of the Dover Township Planning Commission meeting at which such plan is to be considered.
(Ord. 2011-05, 3/14/2011, § 904)