§ 21-206.   Refilling of Opening; Responsibility for Defects Occurring Within 18 Months.
   Any person who shall open or excavate any street in Dover Township shall refill the opening or excavation and in such a manner as to prevent any settling thereafter, and shall restore the surface to the same condition as it was before the opening or excavation all in accordance with Dover Township specifications. As restored, the surface shall conform to the proper grade and be of same surface material (or substantially similar surface material in the discretion of the Township) as the part of the thoroughfare immediately adjoining the opening. If within 18 months after the restoration of the surface as herein provided, defects shall appear resulting from defective backfilling or material, then the permittee shall within 60 days written notice from the Township repair said defect. Upon failure to do so, the Township may do the work and impose upon and collect from the permittee the cost thereof, together with a penalty equal to 20 percent of such cost.
(Ord. 91-1, 9/9/1991; as added by Ord. 2008-07, 9/22/2008, § 3)