1. Schedule of Inspections.
A. The Design Professional, or their assignee, shall inspect all phases of the installation of the permanent stormwater management facilities being constructed for a non-residential facility or constructed under an NPDES permit.
B. Individual residential on-lot stormwater management systems shall be inspected by Municipal staff or their designated representative.
C. During any stage of the work, if the Municipal staff or their designated representative, determines that the permanent stormwater management facilities are not being installed in accordance with the approved stormwater management plan, the Township shall revoke any existing approvals issued under this Chapter until a revised drainage plan is submitted and approved, as specified in this Chapter.
D. All work shall conform to the latest edition of the “Dover Township Construction Specifications.”
(Ord. 2022-01, 7/25/2022)