(A) Settling ponds or basins shall be constructed downstream from areas of potential erosion where such location will provide a significant benefit to water quality.
(B) Temporary stream or watershed diversion shall be restored in final reclamation wherever practicable.
(C) At sites where groundwater recharge is a significant consideration, operations shall be conducted to substantially prevent siltation of recharge areas.
(D) Groundwater resources shall be protected from adverse water quality impacts.
(`78 Code, § 19.12.110.) (Ord. 2386 § 1 (part), 1999.)