Oil production, tank farms, storage facilities, controlled drill sites and underground service lines thereto shall be permitted in all zones which are combined with the O Combining Oil Zone, provided that no underground storage tank, basin, or skimming pond related to such uses shall be constructed within 500 feet of a well owned or operated by the City of Corona which supplies drinking water. Reconstruction or replacement of any such tank existing as of the effective date of this section shall be subject to the review and approval of the General Manager of the Department of Water & Power, or his or her designee. The General Manager shall require:
(A) Testing of the tank site to ascertain whether contamination exists, and at what depth:
(B) That all testing and analysis be performed in accordance with California Environmental Protection Agency and U.S. Environment Protection Agency standards and methods by a qualified person with laboratory certification of the test results; and
(C) That the removal or reconstruction of the existing tank and installation of any new tank be undertaken in strict compliance with all applicable federal, state, and local statutes, regulations, standards, and requirements.
(`78 Code, § 17.60.090.) (Ord. 2971 § 1 (part), 2009.)